▮▮Coloprice

制造商 · United States

Prevalon Energy (Nextpower)

US utility-scale BESS integrator spun out of Mitsubishi Power Americas in 2023 (JV with EES) and acquired by Nextpower (Nasdaq: NXT) in July 2026. Sells the HD5 platform — 5 MWh 20-ft DC enclosures and the new HD5 AC block — with insightOS EMS; 6+ GWh deployed, cells from AESC, contract manufacturing.

国家
United States
总部
Heathrow (Lake Mary), Florida
成立于
2023
官方网站
prevalonenergy.com
应用领域
公用事业级
自主制造电芯

目录中的Prevalon Energy (Nextpower)型号

按最大发布能量排序。点击型号查看所有变体、完整规格以及Prevalon Energy (Nextpower)未发布的字段列表。

型号分类外形最大能量最大功率冷却电池类型单体Ah交流/直流状态规格书
HD5 DC公用事业级20 英尺集装箱30 MWh5 MWliquid-cooledLFP314DC供货中PDF
HD5 AC公用事业级20 英尺集装箱5 MWh2.5 MWliquid-cooledLFP315AC已发布PDF

关于Prevalon Energy (Nextpower)

Prevalon Energy LLC, based in Heathrow, Florida, is the former battery-storage unit of Mitsubishi Power Americas, spun out in late 2023 as a joint venture with EES and sold to Nextpower (formerly Nextracker) for up to $365 million (closed 17 July 2026). It integrates rather than manufactures: cells and modules come from AESC under a 10 GWh multi-year agreement (2026), earlier partnerships covered REPT cells, and enclosures are built by contract manufacturers such as Clou — a reason it does not appear on BNEF's Tier 1 list, which excludes outsourced brands. The line is the HD5 platform: HD5 DC (5 MWh, 314 Ah LFP, liquid-cooled 20-ft enclosure paired with a 5 MVA inverter-MVT skid, 2–8 h) and HD5 AC, launched May 2026 (5 MWh, 315 Ah, integrated string PCS, self-powered auxiliaries), plus a Hybrid Power Stabilizer for data centres. Both spec sheets list UL 1973, UL 9540A ed4, UL 9540, UL 1741, IEEE 1547, NFPA 855/69/70 and >8,000 cycles to 65% SOH; a CSA TS-800 large-scale fire test was completed in April 2025. Not disclosed: cell configuration, DC RTE, warranty; spec sheets are marked 'design estimates only'. No press kit or image licence is published.

照片政策

Prevalon Energy (Nextpower)未发布图像授权或新闻稿,因此产品卡显示示意图而非制造商照片。照片仅在获得书面授权后添加。

Media Room lists press releases and a media contact (Rob Garay, Rob.Garay@PrevalonEnergy.com) but no image kit. Terms of Service §2: "It is prohibited to use for any private use by an individual, or to otherwise use (or copy, modify or distribute) the information on the Website beyond the extent that is authorized by the copyright laws without obtaining a prior approval from Prevalon."

新闻稿 →

来源

本记录所用制造商文档。模型级来源列在各产品卡中。

  • Prevalon — Solutions / home — https://prevalonenergy.com/
  • Prevalon — About Us — https://prevalonenergy.com/about-us/
  • Prevalon — Media Room — https://prevalonenergy.com/media-room/
  • Nextpower definitive agreement to acquire Prevalon (2026-05-28) — https://prevalonenergy.com/nextpower-announces-entry-into-battery-energy-storage-and-ai-data-center-markets-with-definitive-agreement-to-acquire-prevalon-energy/
  • ESS News — Nextpower completes $365m Prevalon acquisition (2026-07-20) — https://www.ess-news.com/2026/07/20/nextpower-completes-365-million-prevalon-energy-acquisition/
  • Prevalon — AESC 10 GWh supply agreement — https://prevalonenergy.com/prevalon-energy-and-aesc-sign-multi-year-supply-agreement-supporting-10-gwh-of-energy-storage-and-data-center-deployments/
  • Prevalon — Terms of Service — https://prevalonenergy.com/terms-of-service/