▮▮Coloprice

Produsen · Amerika Serikat

Prevalon Energy (Nextpower)

US utility-scale BESS integrator spun out of Mitsubishi Power Americas in 2023 (JV with EES) and acquired by Nextpower (Nasdaq: NXT) in July 2026. Sells the HD5 platform — 5 MWh 20-ft DC enclosures and the new HD5 AC block — with insightOS EMS; 6+ GWh deployed, cells from AESC, contract manufacturing.

Negara
Amerika Serikat
Kantor Pusat
Heathrow (Lake Mary), Florida
Didirikan
2023
Situs Web Resmi
prevalonenergy.com
Segmen
skala utilitas
Membuat sel sendiri
tidak

Model Prevalon Energy (Nextpower) di katalog

Diurutkan berdasarkan energi maksimal yang dipublikasikan. Klik model untuk semua varian, spesifikasi lengkap, dan daftar bidang yang tidak dipublikasikan oleh Prevalon Energy (Nextpower).

ModelSegmenFaktor BentukEnergi MaksDaya MaksPendinginanKimiaAh SelAC/DCStatusLembar Spesifikasi
HD5 DCskala utilitaskontainer 20 ft30 MWh5 MWberpendingin cairanLFP314DCpengirimanPDF
HD5 ACskala utilitaskontainer 20 ft5 MWh2,5 MWberpendingin cairanLFP315ACdiumumkanPDF

Tentang Prevalon Energy (Nextpower)

Prevalon Energy LLC, based in Heathrow, Florida, is the former battery-storage unit of Mitsubishi Power Americas, spun out in late 2023 as a joint venture with EES and sold to Nextpower (formerly Nextracker) for up to $365 million (closed 17 July 2026). It integrates rather than manufactures: cells and modules come from AESC under a 10 GWh multi-year agreement (2026), earlier partnerships covered REPT cells, and enclosures are built by contract manufacturers such as Clou — a reason it does not appear on BNEF's Tier 1 list, which excludes outsourced brands. The line is the HD5 platform: HD5 DC (5 MWh, 314 Ah LFP, liquid-cooled 20-ft enclosure paired with a 5 MVA inverter-MVT skid, 2–8 h) and HD5 AC, launched May 2026 (5 MWh, 315 Ah, integrated string PCS, self-powered auxiliaries), plus a Hybrid Power Stabilizer for data centres. Both spec sheets list UL 1973, UL 9540A ed4, UL 9540, UL 1741, IEEE 1547, NFPA 855/69/70 and >8,000 cycles to 65% SOH; a CSA TS-800 large-scale fire test was completed in April 2025. Not disclosed: cell configuration, DC RTE, warranty; spec sheets are marked 'design estimates only'. No press kit or image licence is published.

Kebijakan Foto

Prevalon Energy (Nextpower) tidak mempublikasikan lisensi gambar atau press kit, jadi kartu model menampilkan ilustrasi skematik sebagai ganti foto produsen. Foto akan ditambahkan hanya dengan izin tertulis.

Media Room lists press releases and a media contact (Rob Garay, Rob.Garay@PrevalonEnergy.com) but no image kit. Terms of Service §2: "It is prohibited to use for any private use by an individual, or to otherwise use (or copy, modify or distribute) the information on the Website beyond the extent that is authorized by the copyright laws without obtaining a prior approval from Prevalon."

Kit Pers →

Sumber

Dokumen produsen yang digunakan untuk catatan ini. Sumber tingkat model tercantum pada setiap kartu model.

  • Prevalon — Solutions / home — https://prevalonenergy.com/
  • Prevalon — About Us — https://prevalonenergy.com/about-us/
  • Prevalon — Media Room — https://prevalonenergy.com/media-room/
  • Nextpower definitive agreement to acquire Prevalon (2026-05-28) — https://prevalonenergy.com/nextpower-announces-entry-into-battery-energy-storage-and-ai-data-center-markets-with-definitive-agreement-to-acquire-prevalon-energy/
  • ESS News — Nextpower completes $365m Prevalon acquisition (2026-07-20) — https://www.ess-news.com/2026/07/20/nextpower-completes-365-million-prevalon-energy-acquisition/
  • Prevalon — AESC 10 GWh supply agreement — https://prevalonenergy.com/prevalon-energy-and-aesc-sign-multi-year-supply-agreement-supporting-10-gwh-of-energy-storage-and-data-center-deployments/
  • Prevalon — Terms of Service — https://prevalonenergy.com/terms-of-service/