▮▮Coloprice

40 ·

Statistik pusat data

Angka-angka kunci pasar pusat data — capex, kapasitas, harga, permintaan AI — masing-masing dengan sumber. Bebas dikutip dengan atribusi.

Angka Coloprice, dihitung dari dataset kami

Setiap angka dihitung dari berkas data Coloprice saat build dan tertaut ke halaman serta CSV-nya. Kutip angka beserta tanggalnya.

  1. 1 Katalog Coloprice memuat 6.154 pusat data dari 2.304 operator di 184 negara.

    coloprice.com/data-centers/ · per

  2. 2 1.743 dari 6.154 fasilitas terdaftar memublikasikan daya IT; totalnya 124.823 MW.

    coloprice.com/data-centers/ · per

  3. 3 51,9 GW kapasitas pusat data sedang dibangun dan 39,2 GW diumumkan di 610 proyek yang dilacak (hanya kapasitas yang dipublikasikan).

    coloprice.com/pipeline/ · per · CSV ↓

  4. 4 Amerika Serikat memimpin pipeline konstruksi dengan 34,3 GW dalam pembangunan di 183 proyek.

    coloprice.com/pipeline/ · per · CSV ↓

  5. 5 Colocation grosir berkisar dari $160 per kW per bulan di São Paulo hingga $403 di Singapore di 23 pasar indeks (H2 2025 – Q2 2026).

    coloprice.com/index/ · per · JSON ↓

  6. 6 Median harga colocation grosir di 23 pasar indeks adalah $200 per kW per bulan (H2 2025 – Q2 2026).

    coloprice.com/index/ · per · JSON ↓

  7. 7 Sewa NVIDIA H100 on-demand berkisar $1.3–$12.29 per GPU-jam di penyedia yang dilacak, median $3.9; 10 model GPU dilacak.

    coloprice.com/gpu/ · per · JSON ↓

  8. 8 NVIDIA GB200 adalah GPU termahal yang dilacak: median $13.25 per GPU-jam on-demand, $10.58 dengan komitmen satu tahun.

    coloprice.com/gpu/ · per · JSON ↓

  9. 9 Tender BESS Tiongkok rata-rata $83/kWh untuk sistem 4 jam dan $104/kWh untuk 2 jam, dibandingkan acuan turnkey global $117/kWh; 19 sistem dilacak.

    coloprice.com/bess/ · per · JSON ↓

  10. 10 Listrik komersial untuk pusat data berkisar dari $0.014/kWh di Angola hingga $0.454/kWh di UK di 126 pasar.

    coloprice.com/energy/ · per · CSV ↓

  11. 11 61 pembatasan pemerintah dan operator jaringan terhadap pusat data baru tercatat di 16 negara; 45 berlaku.

    coloprice.com/restrictions/ · per · CSV ↓

  12. 12 47 program insentif pajak pusat data terkatalog di 44 yurisdiksi di 9 negara.

    coloprice.com/incentives/ · per · CSV ↓

  13. 13 141 insiden pusat data terdokumentasi dari 2015 hingga 2026; penyebab utama adalah power, 23% kasus.

    coloprice.com/incidents/ · per · CSV ↓

  14. 14 1.168 fasilitas memegang sertifikat Tier pihak ketiga di 116 negara; India memimpin dengan 92.

    coloprice.com/tiers/ · per · CSV ↓

  15. 15 Greater Jakarta adalah pasar metro terbesar menurut fasilitas yang dilacak: 118 pusat data, 3.510 MW dipublikasikan, 74 operator.

    coloprice.com/markets/greater-jakarta/ · per

Angka pasar dari sumber primer

Market size & capex

  1. 16 Global data center capex has been raised to more than $1 trillion in 2026 and is now forecast to surpass $3 trillion annually by 2030 — nearly double Dell'Oro's January 2026 outlook of $1.7 trillion.

    Dell'Oro Group

  2. 17 Cumulative data center investment need for 2025–2030 is estimated at $6.7 trillion, of which $5.2 trillion is for AI capacity.

    McKinsey

  3. 18 The colocation market is worth $91–104B in 2025 and is projected to reach $165–204B by 2030 (14–16% CAGR).

    MarketsandMarkets / Grand View Research

  4. 19 About 100 GW of new data center capacity will be delivered worldwide in 2026–2030, creating roughly $1.2 trillion of real estate value.

    JLL

Capacity & demand

  1. 20 Global data center demand is projected to nearly triple to 219 GW by 2030; ~70% of new demand is AI workloads.

    McKinsey

  2. 21 AI-ready capacity is set to grow from ~54% of global data center capacity in 2025 (44GW of 82GW) to ~71% by 2030 (156GW of 219GW).

    McKinsey

  3. 22 North America primary-market vacancy hit a record-low 1.4% in H1 2026; Northern Virginia sits at 0.2%.

    CBRE

  4. 23 80.4% of all primary-market data center space under construction is already preleased, up from 74.3% a year earlier.

    CBRE

Pricing

  1. 24 North American wholesale colocation for 250–500kW requirements is on pace to exceed $215/kW/month for full-year 2026, up from a H2 2025 record of $196/kW/month, as CBRE raised its outlook on record-low 1.4% vacancy.

    CBRE, U.S. Real Estate Market Outlook Midyear Review 2026

  2. 25 Ashburn (Northern Virginia) wholesale rates for 10MW+ blocks averaged $173/kW/month (range $160–185) in H1 2026, up just 1.5% YoY — a sharp deceleration from H2 2025's record pace as record-low 0.2% vacancy collided with fewer large deals closing.

    CBRE, North America Data Center Trends H1 2026

  3. 26 Singapore is Asia-Pacific's most expensive colocation market at $330–475/kW/month (avg ≈ $403).

    CBRE

  4. 27 A retail colocation rack (3–5 kW) in the US typically costs $500–1,500 per month.

    Coloprice v1 aggregation

  5. 28 H100 on-demand rental spans $1.49–6.98/GPU·h (Q2 2026); 1-year contracts rebounded 40% to $2.35/GPU·h between Oct 2025 and Mar 2026.

    Silicon Data / SemiAnalysis

Southeast Asia

  1. 29 Southeast Asia's data center market will grow from $15.72B (2025) to $35.08B by 2031 (14.32% CAGR).

    ResearchAndMarkets, Southeast Asia Data Center Market Landscape 2026-2031

  2. 30 Thailand is the region's fastest-growing market: 0.77 GW (2025) to a projected 2.93 GW by 2030 (~30.6% CAGR).

    Mordor Intelligence

  3. 31 Thailand's BOI approved a new record THB 958 billion (~$29B) of investment in May 2026 — six projects, three of them data centers, led by TikTok's $25B expansion.

    Thailand BOI

  4. 32 TikTok/ByteDance's approved investment in Thai data centers has grown to roughly $25 billion — the largest project in the country.

    Mingtiandi

  5. 33 Johor, Malaysia's data center market is now valued at $39.11B with a pipeline of 8,542 MW and colocation vacancy at just 0.7%; build costs reached $12M/MW.

    Knight Frank via EdgeProp

  6. 34 From February 2026 Malaysia restricts new non-AI data centers over grid and water constraints — a window for Thailand and Vietnam.

    Malaysian government / DCD

  7. 35 Vietnam has Southeast Asia's cheapest data center construction at $6–8M per MW; a data-localization law takes effect Jan 1, 2026.

    Mordor Intelligence

Power & energy

  1. 36 Big tech has contracted ~9.8 GW of nuclear capacity across 13 deals: Microsoft (Three Mile Island restart, 835 MW), Google (Kairos SMRs, 500 MW), Amazon (X-energy, up to 12 SMRs), Meta (5.2 GW), plus 2.2 GW from other data-center operators.

    SMR Intel

  2. 37 The first 'nuclear electrons' dedicated to AI data centers are expected in 2027 (Crane Clean Energy Center).

    Constellation / Introl

  3. 38 Grid connection — not floor space — is the binding constraint on new data center supply in every major market.

    Data Center Knowledge

  4. 39 Modern AI halls are designed for 60–130+ kW per rack, making liquid cooling the default for new AI capacity.

    Coloprice v1 aggregation

  5. 40 Thailand's commercial electricity rate is ~THB 4.20–4.55/kWh (≈ $0.12) — 15–20% above Malaysia and Vietnam. A separate green tariff (UGT2) for large users incl. data centers went live in March 2026 at ~THB 4.56/kWh, requiring a 10-year supply agreement with MEA/PEA.

    MEA/PEA / Bangkok Post / BOI (UGT2)

CC BY 4.0 · Data dan kompilasi Coloprice: bebas digunakan kembali di bawah CC BY 4.0 dengan atribusi. Angka dari pihak ketiga tetap milik sumbernya. Lisensi dan atribusi