1 Katalog Coloprice memuat 6.154 pusat data dari 2.304 operator di 184 negara.
2 1.743 dari 6.154 fasilitas terdaftar memublikasikan daya IT; totalnya 124.823 MW.
3 51,9 GW kapasitas pusat data sedang dibangun dan 39,2 GW diumumkan di 610 proyek yang dilacak (hanya kapasitas yang dipublikasikan).
coloprice.com/pipeline/ · per · CSV ↓
4 Amerika Serikat memimpin pipeline konstruksi dengan 34,3 GW dalam pembangunan di 183 proyek.
coloprice.com/pipeline/ · per · CSV ↓
5 Colocation grosir berkisar dari $160 per kW per bulan di São Paulo hingga $403 di Singapore di 23 pasar indeks (H2 2025 – Q2 2026).
coloprice.com/index/ · per · JSON ↓
6 Median harga colocation grosir di 23 pasar indeks adalah $200 per kW per bulan (H2 2025 – Q2 2026).
coloprice.com/index/ · per · JSON ↓
7 Sewa NVIDIA H100 on-demand berkisar $1.3–$12.29 per GPU-jam di penyedia yang dilacak, median $3.9; 10 model GPU dilacak.
coloprice.com/gpu/ · per · JSON ↓
8 NVIDIA GB200 adalah GPU termahal yang dilacak: median $13.25 per GPU-jam on-demand, $10.58 dengan komitmen satu tahun.
coloprice.com/gpu/ · per · JSON ↓
9 Tender BESS Tiongkok rata-rata $83/kWh untuk sistem 4 jam dan $104/kWh untuk 2 jam, dibandingkan acuan turnkey global $117/kWh; 19 sistem dilacak.
coloprice.com/bess/ · per · JSON ↓
10 Listrik komersial untuk pusat data berkisar dari $0.014/kWh di Angola hingga $0.454/kWh di UK di 126 pasar.
coloprice.com/energy/ · per · CSV ↓
11 61 pembatasan pemerintah dan operator jaringan terhadap pusat data baru tercatat di 16 negara; 45 berlaku.
coloprice.com/restrictions/ · per · CSV ↓
12 47 program insentif pajak pusat data terkatalog di 44 yurisdiksi di 9 negara.
coloprice.com/incentives/ · per · CSV ↓
13 141 insiden pusat data terdokumentasi dari 2015 hingga 2026; penyebab utama adalah power, 23% kasus.
coloprice.com/incidents/ · per · CSV ↓
14 1.168 fasilitas memegang sertifikat Tier pihak ketiga di 116 negara; India memimpin dengan 92.
coloprice.com/tiers/ · per · CSV ↓
15 Greater Jakarta adalah pasar metro terbesar menurut fasilitas yang dilacak: 118 pusat data, 3.510 MW dipublikasikan, 74 operator.
Angka pasar dari sumber primer
Market size & capex
16 Global data center capex has been raised to more than $1 trillion in 2026 and is now forecast to surpass $3 trillion annually by 2030 — nearly double Dell'Oro's January 2026 outlook of $1.7 trillion.
17 Cumulative data center investment need for 2025–2030 is estimated at $6.7 trillion, of which $5.2 trillion is for AI capacity.
18 The colocation market is worth $91–104B in 2025 and is projected to reach $165–204B by 2030 (14–16% CAGR).
19 About 100 GW of new data center capacity will be delivered worldwide in 2026–2030, creating roughly $1.2 trillion of real estate value.
Capacity & demand
20 Global data center demand is projected to nearly triple to 219 GW by 2030; ~70% of new demand is AI workloads.
21 AI-ready capacity is set to grow from ~54% of global data center capacity in 2025 (44GW of 82GW) to ~71% by 2030 (156GW of 219GW).
22 North America primary-market vacancy hit a record-low 1.4% in H1 2026; Northern Virginia sits at 0.2%.
23 80.4% of all primary-market data center space under construction is already preleased, up from 74.3% a year earlier.
Pricing
24 North American wholesale colocation for 250–500kW requirements is on pace to exceed $215/kW/month for full-year 2026, up from a H2 2025 record of $196/kW/month, as CBRE raised its outlook on record-low 1.4% vacancy.
25 Ashburn (Northern Virginia) wholesale rates for 10MW+ blocks averaged $173/kW/month (range $160–185) in H1 2026, up just 1.5% YoY — a sharp deceleration from H2 2025's record pace as record-low 0.2% vacancy collided with fewer large deals closing.
26 Singapore is Asia-Pacific's most expensive colocation market at $330–475/kW/month (avg ≈ $403).
27 A retail colocation rack (3–5 kW) in the US typically costs $500–1,500 per month.
Coloprice v1 aggregation
28 H100 on-demand rental spans $1.49–6.98/GPU·h (Q2 2026); 1-year contracts rebounded 40% to $2.35/GPU·h between Oct 2025 and Mar 2026.
Southeast Asia
29 Southeast Asia's data center market will grow from $15.72B (2025) to $35.08B by 2031 (14.32% CAGR).
ResearchAndMarkets, Southeast Asia Data Center Market Landscape 2026-2031
30 Thailand is the region's fastest-growing market: 0.77 GW (2025) to a projected 2.93 GW by 2030 (~30.6% CAGR).
31 Thailand's BOI approved a new record THB 958 billion (~$29B) of investment in May 2026 — six projects, three of them data centers, led by TikTok's $25B expansion.
32 TikTok/ByteDance's approved investment in Thai data centers has grown to roughly $25 billion — the largest project in the country.
33 Johor, Malaysia's data center market is now valued at $39.11B with a pipeline of 8,542 MW and colocation vacancy at just 0.7%; build costs reached $12M/MW.
34 From February 2026 Malaysia restricts new non-AI data centers over grid and water constraints — a window for Thailand and Vietnam.
35 Vietnam has Southeast Asia's cheapest data center construction at $6–8M per MW; a data-localization law takes effect Jan 1, 2026.
Power & energy
36 Big tech has contracted ~9.8 GW of nuclear capacity across 13 deals: Microsoft (Three Mile Island restart, 835 MW), Google (Kairos SMRs, 500 MW), Amazon (X-energy, up to 12 SMRs), Meta (5.2 GW), plus 2.2 GW from other data-center operators.
37 The first 'nuclear electrons' dedicated to AI data centers are expected in 2027 (Crane Clean Energy Center).
38 Grid connection — not floor space — is the binding constraint on new data center supply in every major market.
39 Modern AI halls are designed for 60–130+ kW per rack, making liquid cooling the default for new AI capacity.
Coloprice v1 aggregation
40 Thailand's commercial electricity rate is ~THB 4.20–4.55/kWh (≈ $0.12) — 15–20% above Malaysia and Vietnam. A separate green tariff (UGT2) for large users incl. data centers went live in March 2026 at ~THB 4.56/kWh, requiring a 10-year supply agreement with MEA/PEA.