▮▮Coloprice

Envision Energy · utility-scale

Envision Energy EN 12.5 MWh AI Energy Storage System

announced

modular blockDC blockliquid-cooledLFP · 790 AhBNEF Tier 1

Everything below comes from what Envision Energy publishes about the EN 12.5 MWh AI Energy Storage System: the datasheet, the product page and press releases. Where a figure is not published, the field says so — we do not estimate.

Schematic illustration — not a manufacturer photo

Variants

12.5 MWh

Verified 2026-08

Variants

Energy figures are nominal (beginning of life) as published by the manufacturer. One model, several duration options — the same enclosure with different power ratings.

VariantsEnergyPowerDuration
EN 12.5 MWh12.5 MWhnot publishednot published

Specifications

Cell chemistryLFP
Cell capacity790 Ah
Cell configurationnot published
Cell suppliernot published
Form factormodular block
Block typeDC block
PCS integratedno
DC voltagenot published
Coolingliquid-cooled
Ingress protectionnot published
Operating temperaturenot published
Dimensions (L × W × H)not published
Weightnot published
Energy densitynot published
Round-trip efficiencynot published
Cycle lifenot published
Calendar lifenot published
Warrantynot published
Fire suppressionnot published
Generationnot published
Announced2026-04

Key facts

  • Announced at ESIE Beijing, 1 April 2026: 12.5 MWh system built on the 790 Ah wound prismatic LFP ESS cell (>440 Wh/L, >15,000 cycles, 30-year calendar life, cell RTE 96 % — cell-level figures per Envision)
  • Paired with a new 6.X–12.X MW 'AI-adaptive' PCS-transformer unit (3rd-gen SiC, 99.3 % efficiency, full load at 55 °C); system efficiency stated as >92 %
  • Large-subarray layout claimed to cut site footprint by 37.6 % vs previous generation
  • 790 Ah cell reported in mass production; system form factor, dimensions, weight, voltage and certifications not published (Chinese-language announcement only)

What Envision Energy does not publish for this model

These fields are empty because no public datasheet or release states them. That is information too: ask for these numbers before you shortlist.

Cell configurationCell supplierDC voltageIngress protectionOperating temperatureDimensions (L × W × H)WeightEnergy densityRound-trip efficiencyCycle lifeCalendar lifeWarrantyFire suppressionGeneration

Price signal

not published

No published price — Envision has not disclosed pricing for this flagship, launched April 2026 as the world's largest single BESS unit at the time. Built on a new 790Ah LFP prismatic cell (>440 Wh/L density, >15,000 cycles, up to 30-year calendar life, 96% cell-level RTE); already in mass production at Envision's Cangzhou superfactory. Supersedes the 8 MWh Gen 8 as Envision's flagship; no vendor quote exists to confirm a price against China's $75-84/kWh tender benchmarks.

From the Coloprice BESS Price Index — a benchmark, not an offer. See the index for how each figure was collected. See the BESS Price Index →

Similar systems from other manufacturers

Sourcing quote for Envision Energy EN 12.5 MWh AI Energy Storage System

Coloprice is published by Dream View, a China-sourcing company. For commercial-scale projects we buy BESS containers factory-direct — verified manufacturer, certification review, pre-shipment inspection, export and freight — for a flat 10% fee.

We reply within one business day. No spam, no reselling your contacts.

Sources: Envision Energy — 12.5 MWh AI ESS / 790 Ah cell (2026-04-04, CN)