In this market the scarce asset is not acreage — it is a signed grid connection. «Powered land» means a site with secured or well-queued utility capacity, and it trades at multiples of comparable land without power. This page explains what qualifies, and takes confidential intake from both owners and buyers while the listing program is in build-out.

Quick answer

What is powered land?

A development site where utility power is already secured or credibly queued: a signed interconnection or capacity agreement, a substation nearby with confirmed headroom, or an advanced position in the utility's queue. Everything else — fiber routes, water, zoning — matters, but power defines the price: buyers routinely pay several times more for a plot with 100 MW secured than for better land still waiting in a five-year queue.

What buyers verify first

Power position

Signed capacity agreement or queue position with the utility, target MW and energization dates — documents, not statements.

Substation & headroom

Distance to the serving substation, its voltage, and whether the stated headroom is confirmed by the utility.

Fiber & latency

Distance to long-haul routes and metro rings; two independent paths minimum for a serious campus.

Water, zoning, permits

Cooling water rights or reuse options, current zoning, and how far permitting has progressed.

Where the demand is

Our development pipeline shows where operators are placing gigawatt-scale bets — those markets are where powered land clears fastest. Cross-check electricity benchmarks before pricing a site: the tariff corridor shapes what a buyer will pay.

FacilityOperatorCityPower, MWStatus
Meta Hyperion (Richland Parish)MetaRichland Parish, LA, United States5000Under construction
OpenAI Project Camellia (Effingham County)OpenAI (developer Octans GA LLC)Effingham County, GA, United States3210Announced
Google Project Tembo (Laramie County)Google (Jupiter Star Holdings, LLC)Cheyenne, WY, United States2700Announced
Aligned Data Centers Project PhoenixAligned Data CentersShippingport, Pennsylvania, United States2000Under construction
Brookfield / NextEra Paducah AI Campus (DOE Paducah Site)Brookfield (developer/operator) / NextEra EnergyPaducah, KY, United States1800Announced
Galaxy Helios Data Center CampusGalaxy Digital (tenant: CoreWeave)Dickens, TX, United States1630Under construction
IREN Oklahoma CampusIRENOklahoma, United States1600Announced
Western Downs Digital Park (Zerra DC)Zerra DCDalby (Kogan), Australia1440Announced

Pipeline →Power & energy →

Listed sites

Consented listings. Figures are as stated by the owner and verified under NDA through the brokerage desk; street addresses are not published. Inquiries go through the intake form below and are routed to the owner.

SiteMarketSite sizeUtility serviceIT loadFiberApprovalsListed
Front Range Compute — Larkspur
Front Range Compute · Powered-land position — not an operating data center
Larkspur, Colorado, United States2.8 acres3 MW energized · 480 V · CORE Electric
service capacity, not IT load · planned expansion +6 MW
not statednot in serviceTown of Larkspur approval for data-center use pending

Request details →

For site owners

We route qualified sites to a licensed data center brokerage desk and matched developers under NDA — nothing is published without your sign-off, and our compensation is a registered referral share. Describe the site below; power documentation moves it to the top of the queue.

For buyers and developers

Tell us the target markets, MW and timeline — mandates are matched against incoming sites and the development pipeline.

Powered land and pipeline moves are covered in the weekly digest.

FAQ

How much more is land with power worth?

There is no public index — deals are private — but the market logic is consistent: interconnection queues in major markets run three to five years, so a site with signed capacity effectively sells years of time. That premium routinely reaches multiples of the un-powered comparable, scaling with secured MW and energization date.

Do you publish listed sites?

Yes, with the owner's consent. Listed sites appear in the table above with owner-stated figures and no street addresses; the underlying documents move under NDA through a licensed brokerage partner. Nothing is published without sign-off, and an entry is updated or withdrawn on the owner's request.

Which markets clear fastest?

Follow the development pipeline: markets where operators announce gigawatt-scale campuses — Northern Virginia, Texas and Phoenix in the US, Johor and Batam in Southeast Asia, Madrid and the Nordics in Europe — are where powered sites attract competing bids.