8 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Angola: Q3 2026 Price Index
Compare 8 data centers in Angola across 7 operators, 7 MW: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Angola & other markets — The Colocation Price Index → · Best data centers in Angola → · Data center companies in Angola · Colocation pricing and providers in Angola →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Raxio AG1 | Raxio Group | Angola | Luanda | 7 | III | — | data pending | Operational |
| Banco Millennium Atlantico (BMA) CFIN ATLANTICO Data Center | Banco Millennium Atlantico (BMA) | Angola | Tatatona Luanda | — | III | — | data pending | Operational |
| Empresa Interbancária de Serviços (EMIS) Centro Informático Seguro #2 (CIS II) | Empresa Interbancária de Serviços (EMIS) | Angola | Luanda | — | III | — | data pending | Operational |
| Empresa Interbancária de Serviços (EMIS) Centro Informático Seguro # 1 (CIS I) | Empresa Interbancária de Serviços (EMIS) | Angola | Luanda | — | III | — | data pending | Operational |
| ASA MSTelcom Data Centre | ASA MSTelcom | Angola | Luanda | — | III | — | data pending | Operational |
| Datacenter Multipla | IP WORLD - Sociedade de servicos e telecomunicacoes Limitada | Angola | Luanda | — | — | — | data pending | Operational |
| Paratus ITA-DC1 | Paratus Group Holdings | Angola | Luanda | — | — | — | data pending | Operational |
| AngoNAP Luanda | Angola Cables | Angola | Luanda | — | — | — | data pending | Operational |
Nothing matches the filters
All 8 facilities, A–Z
- AngoNAP Luanda Luanda
- ASA MSTelcom Data Centre Luanda
- Banco Millennium Atlantico (BMA) CFIN ATLANTICO Data Center Tatatona Luanda
- Datacenter Multipla Luanda
- Empresa Interbancária de Serviços (EMIS) Centro Informático Seguro # 1 (CIS I) Luanda
- Empresa Interbancária de Serviços (EMIS) Centro Informático Seguro #2 (CIS II) Luanda
- Paratus ITA-DC1 Luanda
- Raxio AG1 Luanda
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.014
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 5 Tier III/IV · 0 AI-ready · 7+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Angola | · · · | $0.014 | 8 | — |
| South Africa | · · · | $0.144 | 42 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Angola's catalog entries are both in Luanda: Raxio Group's AG1, commissioned in October 2025 with 800 racks and 7 MW of IT power and marketed by its developer as the country's largest data center, and ASA MSTelcom's data center, run by Angola's satellite and telecommunications state operator. Both hold Uptime Institute Tier III Design Documents-level certification rather than a Constructed Facility award. Business electricity runs $0.014/kWh (GlobalPetrolPrices, Dec 2025) — among the lowest rates the catalog tracks — reflecting a grid mix of hydropower and oil/gas generation with historically heavy retail subsidies. Angola is a new entry in the catalog.
Frequently asked questions
How much does colocation cost in Angola?
No published wholesale $/kW benchmark exists for Angola yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 8 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Angola?
Commercial electricity in Angola is $0.014 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 8 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Angola?
Angola sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Angola market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Angola?
Coloprice tracks 8 data centers in Angola: 8 operational with 7 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.