▮▮Coloprice
← All countries

1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Aruba: Q3 2026 Price Index

Compare 1 data centers in Aruba across 1 operators: capacity, status, certifications, facilities and colocation pricing context.

1 facilities1 operators

Colocation pricing: Aruba & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.303

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

Why prices sit where they do

Aruba's catalog entry is SETAR, the island's national telecom incumbent, which has operated a colocation data center from Oranjestad since 2016 with dual utility feeds, backup generation and inverter-based precision cooling. SETAR does not publish an address, power capacity or floor area for the site, and Uptime Institute's public registry lists zero certified projects for Aruba. As a small island economy heavily dependent on tourism, Aruba's disclosed data-center footprint is limited to this single national-carrier facility; no independent commercial colocation operator with verifiable specifics was found. Business electricity runs $0.303/kWh (GlobalPetrolPrices, Dec 2025), reflecting an isolated grid historically reliant on imported fuel oil with a growing share of wind generation — Aruba has one of the Caribbean's more advanced wind-power programs.

Frequently asked questions

How much does colocation cost in Aruba?

No published wholesale $/kW benchmark exists for Aruba yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Aruba?

Commercial electricity in Aruba is $0.303 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Aruba market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Aruba?

Coloprice tracks 1 data centers in Aruba: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
SETAR Colocation DatacenterSETAR N.V.ArubaOranjestad12·Operational