2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Bahamas: Q3 2026 Price Index
Compare 2 data centers in Bahamas across 2 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Bahamas & other markets — The Colocation Price Index →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Secure Shore Data Center | Secure Shore | Bahamas | Nassau | — | — | — | data pending | Operational |
| Grand Bahama Data Centre | Cable Bahamas | Bahamas | Freeport | — | — | — | data pending | Operational |
Nothing matches the filters
All 2 facilities, A–Z
- Grand Bahama Data Centre Freeport
- Secure Shore Data Center Nassau
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.345
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Bahamas | · · · | $0.345 | 2 | — |
| Cayman Islands | · · · | $0.375 | 3 | — |
| Jamaica | · · · | $0.237 | 3 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
The Bahamas enters the catalog through Nassau, where Secure Shore operates a carrier-neutral colocation facility on Munnings Road, and Freeport, where Cable Bahamas' Grand Bahama Data Centre (opened 2013) forms a disaster-recovery pair linked by fiber to Nassau. Neither operator publishes formal tier or ISO certification, power capacity or cooling specifications, so those fields stay null -- the market remains largely uncertified, built around offshore data-residency and hurricane-resilience marketing rather than published engineering specs. No Uptime Institute or EPI-certified facility exists in the country. GlobalPetrolPrices puts December 2025 business electricity at $0.345/kWh, among the highest commercial rates in the Caribbean, consistent with the islands' oil-fired generation.
Frequently asked questions
How much does colocation cost in Bahamas?
No published wholesale $/kW benchmark exists for Bahamas yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Bahamas?
Commercial electricity in Bahamas is $0.345 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Bahamas?
On power alone, Jamaica ($0.237/kWh) run below Bahamas. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Bahamas market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Bahamas?
Coloprice tracks 2 data centers in Bahamas: 2 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →
