4 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Curaçao: Q3 2026 Price Index
Compare 4 data centers in Curaçao across 4 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Curaçao & other markets — The Colocation Price Index → · Best data centers in Curaçao → · Data center companies in Curaçao · Colocation pricing and providers in Curaçao →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Blue NAP Americas Datacenter | Dataplanet N.V. | Curaçao | Willemstad | — | IV | ISO 27001SOC 2 | data pending | Operational |
| CORE N.V. Data Center | CORE N.V. | Curaçao | Willemstad | — | — | — | data pending | Operational |
| E-Commerce Park N.V. | E-Commerce Park N.V. | Curaçao | Willemstad | — | — | — | data pending | Operational |
| UTS/Flow Co-Location Center | UTS (United Telecommunication Services) / Flow Curaçao | Curaçao | Willemstad | — | — | — | data pending | Operational |
Nothing matches the filters
All 4 facilities, A–Z
- Blue NAP Americas Datacenter Willemstad
- CORE N.V. Data Center Willemstad
- E-Commerce Park N.V. Willemstad
- UTS/Flow Co-Location Center Willemstad
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
· · ·
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Curaçao | · · · | — | 4 | — |
| Colombia | $190 | $0.276 | 45 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Curaçao's catalog entry is Dataplanet's Blue NAP Americas facility in Willemstad, marketed by the operator as the only Uptime-certified Tier IV, ANSI/TIA-942-B Rated-4 data centre in the Caribbean; power capacity and floor space are not published on the operator's own site. As a constituent country of the Kingdom of the Netherlands sitting outside the Atlantic hurricane belt, Curaçao positions itself as a resilient interconnection point between North, Central and South America, with the facility ISO 27001 and SOC 2 certified and adherent to EU-aligned data-protection rules. No published business electricity tariff is available for Curaçao, whose small, oil-dependent grid is not tracked by the aggregators this catalog otherwise relies on, so the market carries no $/kWh figure yet.
Frequently asked questions
How much does colocation cost in Curaçao?
No published wholesale $/kW benchmark exists for Curaçao yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 4 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Where is colocation cheaper near Curaçao?
Curaçao sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Curaçao market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Curaçao?
Coloprice tracks 4 data centers in Curaçao: 4 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →
