10 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Dominican Republic: Q3 2026 Price Index
Compare 10 data centers in Dominican Republic across 9 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Dominican Republic & other markets — The Colocation Price Index → · Best data centers in Dominican Republic → · Data center companies in Dominican Republic · Colocation pricing and providers in Dominican Republic →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| KIO SDO|1 | KIO Networks | Dominican Republic | Santo Domingo | — | IV | — | 37D | Operational |
| Banco Múltiple BHD, S. A. BHD Centro de Datos Principal | Banco Múltiple BHD, S. A. | Dominican Republic | Santo Domingo | — | III | — | data pending | Operational |
| Data Center Centro de Operaciones Banco Popular Dominicano | Banco Popular Dominicano | Dominican Republic | Santo Domingo | — | III | — | data pending | Operational |
| Alameda Data Center | Compañía Dominicana de Teléfonos, C. por A. (Claro Dominicana) | Dominican Republic | Santo Domingo Oeste | — | II | — | data pending | Operational |
| NAP del Caribe Datacenter | NAP del Caribe | Dominican Republic | Santo Domingo | — | III | — | data pending | Operational |
| Compania Dominicana de Telefonos, C. por A. (Claro Dom) Alameda | Compania Dominicana de Telefonos, C. por A. (Claro Dom) | Dominican Republic | Santo Domingo | — | II | — | data pending | Operational |
| Herrera Data Center 777 | Altice Dominicana | Dominican Republic | Santo Domingo | — | II | — | data pending | Operational |
| NETWORK ACCESS POINT DEL CARIBE (PCSD) | NAP del Caribe | Dominican Republic | La Caleta | — | — | — | data pending | Operational |
| ECOM | ELIAS COMUNICACIONES, SRL | Dominican Republic | LA VEGA | — | — | — | data pending | Operational |
| CEMO DC | CENTRIC MOBILITY (CEMO), S.R.L | Dominican Republic | Santiago | — | — | — | data pending | Operational |
Nothing matches the filters
All 10 facilities, A–Z
- Alameda Data Center Santo Domingo Oeste
- Banco Múltiple BHD, S. A. BHD Centro de Datos Principal Santo Domingo
- CEMO DC Santiago
- Compania Dominicana de Telefonos, C. por A. (Claro Dom) Alameda Santo Domingo
- Data Center Centro de Operaciones Banco Popular Dominicano Santo Domingo
- ECOM LA VEGA
- Herrera Data Center 777 Santo Domingo
- KIO SDO|1 Santo Domingo
- NAP del Caribe Datacenter Santo Domingo
- NETWORK ACCESS POINT DEL CARIBE (PCSD) La Caleta
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.172
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 4 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Dominican Republic | · · · | $0.172 | 10 | — |
| Jamaica | · · · | $0.237 | 3 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
The Dominican Republic's catalog centers on Greater Santo Domingo, anchored by KIO Networks' SDO|1 in Zona Franca Las Américas — a hurricane- and seismic-resistant, Tier IV Design-certified, carrier-neutral site operating since 2014 with seven-day generator autonomy. Three more Uptime-registered facilities now round out the market: telecom incumbents Altice (Herrera Data Center 777, Tier II Design) and Claro Dominicana (Alameda, in Santo Domingo Oeste, Tier II Design and Constructed Facility), plus neutral operator NAP del Caribe's Tier III-Design site, which hosts operations for enterprise clients including Banco Popular Dominicano. None discloses IT power capacity beyond KIO's own figures. Business electricity runs $0.172/kWh (GlobalPetrolPrices, Dec 2025), reflecting a thermal-heavy grid with growing solar and wind and a history of distribution losses that pushes resilience-minded operators toward heavy on-site backup generation, consistent with KIO's own extended autonomy at SDO|1.
Frequently asked questions
How much does colocation cost in Dominican Republic?
No published wholesale $/kW benchmark exists for Dominican Republic yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 10 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Dominican Republic?
Commercial electricity in Dominican Republic is $0.172 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 10 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Dominican Republic?
Dominican Republic sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Dominican Republic market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Dominican Republic?
Coloprice tracks 10 data centers in Dominican Republic: 10 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day