Data Center Colocation Costs in Ecuador: Q3 2026 Price Index

Compare 2 data centers in Ecuador across 2 operators: capacity, status, certifications, facilities and colocation pricing context.

2 facilities2 operators

Colocation pricing: Ecuador & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.095

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Ecuador· · ·$0.0952
Colombia· · ·$0.27618
Chile· · ·$0.21226

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Ecuador's catalog opens with Telconet's Cloud Center I in Guayaquil, an Uptime Institute Tier IV Certified Constructed Facility and the country's first, built to TIA-942, TIA-568 and ISO/IEC 22237 design standards with 2(N+1) power and cooling redundancy. Telconet, the country's largest fixed-line and data-centre operator, has since opened additional cloud-centre capacity in Quito and a further Guayaquil building, though only Cloud Center I carries a disclosed, independently verifiable Tier rating in sources this catalog can confirm. Business electricity runs $0.095/kWh (GlobalPetrolPrices, Dec 2025), among the lower rates in the region thanks to Ecuador's large hydropower base, though the grid has faced recurring drought-driven rationing in recent years that adds risk for continuous, high-density colocation loads.

Frequently asked questions

How much does colocation cost in Ecuador?

No published wholesale $/kW benchmark exists for Ecuador yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Ecuador?

Commercial electricity in Ecuador is $0.095 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Ecuador?

Ecuador sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Ecuador market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Ecuador?

Coloprice tracks 2 data centers in Ecuador: 2 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Telconet Cloud Center ITelconet S.A.EcuadorGuayaquilIV39DOperational
Cirion Quito (QUI2)Cirion TechnologiesEcuadorQuito7·Operational