▮▮Coloprice
← All countries

3 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Sierra Leone: Q3 2026 Price Index

Compare 3 data centers in Sierra Leone across 2 operators: capacity, status, certifications, facilities and colocation pricing context.

3 facilities2 operators

Colocation pricing: Sierra Leone & other markets — The Colocation Price Index → · Best data centers in Sierra Leone → · Data center companies in Sierra Leone · Colocation pricing and providers in Sierra Leone →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.342

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources

Why prices sit where they do

Sierra Leone's catalog entries reflect a market shaped by unreliable public power and disaster-recovery planning rather than density. Afcom, an independent carrier-neutral operator, runs a self-described Tier III facility on Beach Road in Freetown with 2N+1 UPS and generators rated for at least two weeks of unrefuelled operation. Orange Sierra Leone operates the country's primary facility in Freetown and, since December 2025, a $26.7 million exact-replica backup site in Bo — built explicitly as a disaster-recovery hub after landslide and flooding risk exposed the capital's single point of failure, and pitched as extending digital infrastructure into the country's southern and eastern regions. GlobalPetrolPrices puts the December 2025 business tariff at $0.342/kWh, among the highest metered commercial rates in West Africa, which is why operators here budget for heavy diesel-generator backup rather than treating grid power as a real operating-cost floor.

Frequently asked questions

How much does colocation cost in Sierra Leone?

No published wholesale $/kW benchmark exists for Sierra Leone yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Sierra Leone?

Commercial electricity in Sierra Leone is $0.342 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Sierra Leone market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Sierra Leone?

Coloprice tracks 3 data centers in Sierra Leone: 3 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Orange Sierra Leone Data Center FreetownOrange Sierra LeoneSierra LeoneFreetown——12·—Operational
Orange Sierra Leone Data Center BoOrange Sierra LeoneSierra LeoneBo——11·—Operational
Afcom Data Center FreetownAfcomSierra LeoneFreetown—III*20E—Operational