Grenoble, France vs Marseille, France

Both columns are built from the catalog and the price index: Grenoble — 5 facilities from 5 operators, Marseille — 8 facilities from 4 operators. Where a benchmark or a tariff is not published, the cell says so.

Markets side by side

FieldGrenobleMarseille
Tracked facilities58
Operators54
Published IT capacitynot published1 MW (1 of 8 sites publish)
Operational57
Under construction / announced01
Tier III+ certified sites00
Sites with any certification16
Liquid-cooled sites10
AI-ready sites00
Wholesale benchmark, $/kW/month$190 (country-level)$190 (country-level)
Benchmark change, yoynot publishednot published
Industrial power tariff, $/kWh$0.173$0.173
Average Coloprice Score14/100 across 5 sites32/100 across 8 sites
Latency between the twonot published

Counts are the Coloprice catalog as of 2026-10-01; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.

Where they differ

Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.

  • Tracked facilities: Grenoble — 5; Marseille — 8
  • Operators: Grenoble — 5; Marseille — 4
  • Operational: Grenoble — 5; Marseille — 7
  • Under construction / announced: Grenoble — 0; Marseille — 1
  • Sites with any certification: Grenoble — 1; Marseille — 6
  • Liquid-cooled sites: Grenoble — 1; Marseille — 0
  • Average Coloprice Score: Grenoble — 14/100 across 5 sites; Marseille — 32/100 across 8 sites

Published for only one side: Published IT capacity.

Top facilities by score

Grenoble, France

Marseille, France

Open Grenoble data centers →Open Marseille data centers →Colocation pricing in Grenoble →Colocation pricing in Marseille →

Other comparisons

Grenoble vs ParisGrenoble vs La CourneuveMarseille vs ParisLa Courneuve vs Marseille