Operator comparison
Center3 (stc Group) vs Mobily (Etihad Etisalat)
Both columns come from the facilities each operator publishes and Coloprice tracks: Center3 (stc Group) — 3 facilities in 1 countries, Mobily (Etihad Etisalat) — 5 facilities in 1 countries. Score is the independent Coloprice Score of each facility, averaged; it is never sold.
Center3 (stc Group)
3
Tracked facilities · Countries: 1
Where they operate: Saudi Arabia
Mobily (Etihad Etisalat)
5
Tracked facilities · Countries: 1
Where they operate: Saudi Arabia
Portfolios side by side
| Field | Center3 (stc Group) | Mobily (Etihad Etisalat) |
|---|---|---|
| Tracked facilities | 3 | 5 |
| Countries | 1 | 1 |
| Cities | 3 | 3 |
| Published IT capacity | 44 MW (2 of 3 sites publish) | not published |
| Operational | 3 | 5 |
| Under construction / announced | 0 | 0 |
| Liquid-cooled sites | 0 | 0 |
| AI-ready sites | 0 | 0 |
| Most common certifications | Uptime Institute Tier III Certification | Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Gold Certification of Operational Sustainability, Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility |
| Average Coloprice Score | 33/100 across 3 scored sites | 36/100 across 5 scored sites |
| Awards and badges | 3 | 9 |
| Highest-scored facility | Center3 Al-Khobar Data Center (45/100) | Mobily Al Malqa 2 Data Center (44/100) |
Counts are the Coloprice catalog as of 2026-09-26; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Tracked facilities: Center3 (stc Group) — 3; Mobily (Etihad Etisalat) — 5
- Operational: Center3 (stc Group) — 3; Mobily (Etihad Etisalat) — 5
- Most common certifications: Center3 (stc Group) — Uptime Institute Tier III Certification; Mobily (Etihad Etisalat) — Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Gold Certification of Operational Sustainability, Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility
- Average Coloprice Score: Center3 (stc Group) — 33/100 across 3 scored sites; Mobily (Etihad Etisalat) — 36/100 across 5 scored sites
- Awards and badges: Center3 (stc Group) — 3; Mobily (Etihad Etisalat) — 9
- Highest-scored facility: Center3 (stc Group) — Center3 Al-Khobar Data Center (45/100); Mobily (Etihad Etisalat) — Mobily Al Malqa 2 Data Center (44/100)
Published for only one side: Published IT capacity.
Highest-scored facility
Center3 (stc Group)
Center3 Al-Khobar Data Center
Al-Khobar, Saudi Arabia · 24.4 MW · 45/100
Mobily (Etihad Etisalat)
Mobily Al Malqa 2 Data Center
Riyadh, Saudi Arabia · 44/100
Open Center3 (stc Group) profile →Open Mobily (Etihad Etisalat) profile →
Other comparisons
Center3 (stc Group) vs stc / Center3Mobily (Etihad Etisalat) vs stc / Center3