Operator comparison
Neterra vs Telepoint
Both columns come from the facilities each operator publishes and Coloprice tracks: Neterra — 3 facilities in 1 countries, Telepoint — 3 facilities in 1 countries. Score is the independent Coloprice Score of each facility, averaged; it is never sold.
Neterra
3
Tracked facilities · Countries: 1
Where they operate: Bulgaria
Telepoint
3
Tracked facilities · Countries: 1
Where they operate: Bulgaria
Portfolios side by side
| Field | Neterra | Telepoint |
|---|---|---|
| Tracked facilities | 3 | 3 |
| Countries | 1 | 1 |
| Cities | 3 | 2 |
| Published IT capacity | not published | not published |
| Operational | 3 | 3 |
| Under construction / announced | 0 | 0 |
| Liquid-cooled sites | 0 | 0 |
| AI-ready sites | 0 | 0 |
| Most common certifications | ISO 20001, ISO 22301, ISO 27001, ISO 50001 | ISO 9001:2015, ISO/IEC 27001:2013, PCI DSS 4.0 |
| Average Coloprice Score | 20/100 across 3 scored sites | 19/100 across 3 scored sites |
| Awards and badges | 2 | 2 |
| Highest-scored facility | Sofia Data Center (SDC1/SDC2) (47/100) | Telepoint Sofia East (21/100) |
Counts are the Coloprice catalog as of 2026-09-26; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Cities: Neterra — 3; Telepoint — 2
- Most common certifications: Neterra — ISO 20001, ISO 22301, ISO 27001, ISO 50001; Telepoint — ISO 9001:2015, ISO/IEC 27001:2013, PCI DSS 4.0
- Average Coloprice Score: Neterra — 20/100 across 3 scored sites; Telepoint — 19/100 across 3 scored sites
- Highest-scored facility: Neterra — Sofia Data Center (SDC1/SDC2) (47/100); Telepoint — Telepoint Sofia East (21/100)