▮▮Coloprice

Operator comparison

Neterra vs Telepoint

Both columns come from the facilities each operator publishes and Coloprice tracks: Neterra — 5 facilities in 1 countries, Telepoint — 3 facilities in 1 countries. Score is the independent Coloprice Score of each facility, averaged; it is never sold.

Portfolios side by side

FieldNeterraTelepoint
Tracked facilities53
Countries11
Cities52
Published IT capacitynot publishednot published
Operational53
Under construction / announced00
Liquid-cooled sites00
AI-ready sites00
Most common certificationsISO 20001, ISO 22301, ISO 27001, ISO 50001ISO 9001:2015, ISO/IEC 27001:2013, PCI DSS 4.0
Average Coloprice Score16/100 across 5 scored sites19/100 across 3 scored sites
Awards and badges25
Highest-scored facilitySofia Data Center (SDC1/SDC2) (47/100)Telepoint Sofia East (21/100)

Counts are the Coloprice catalog as of 2026-10-01; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.

Where they differ

Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.

  • Tracked facilities: Neterra — 5; Telepoint — 3
  • Cities: Neterra — 5; Telepoint — 2
  • Operational: Neterra — 5; Telepoint — 3
  • Most common certifications: Neterra — ISO 20001, ISO 22301, ISO 27001, ISO 50001; Telepoint — ISO 9001:2015, ISO/IEC 27001:2013, PCI DSS 4.0
  • Average Coloprice Score: Neterra — 16/100 across 5 scored sites; Telepoint — 19/100 across 3 scored sites
  • Awards and badges: Neterra — 2; Telepoint — 5
  • Highest-scored facility: Neterra — Sofia Data Center (SDC1/SDC2) (47/100); Telepoint — Telepoint Sofia East (21/100)

Highest-scored facility

Open Neterra profile →Open Telepoint profile →