1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Andorra: Q3 2026 Price Index
Compare 1 data centers in Andorra across 1 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Andorra & other markets — The Colocation Price Index →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Andorra Telecom Data Center | Andorra Telecom | Andorra | La Massana | — | — | ISO 9001ISO 27001+2 | data pending | Operational |
Nothing matches the filters
All 1 facilities, A–Z
- Andorra Telecom Data Center La Massana
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.173
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Andorra enters the catalog through Andorra Telecom, the state-owned monopoly operator of fixed, mobile, TV and internet services, which runs a colocation data center in La Massana. The facility is a 170-square-meter "clean room" built in 2008, offering unit, half-rack, full-rack and cube colocation, redundant fiber up to 10 Gbps, N+1-class UPS-and-generator power, in-row cooling and gas fire suppression, and carries ISO 9001, ISO 27001, ISO 14000 and OHSAS 18000 certifications quoted directly from the operator. As the sole telecom operator in the microstate, Andorra Telecom effectively defines the country's entire colocation market. GlobalPetrolPrices puts December 2025 business electricity at $0.173/kWh.
Frequently asked questions
How much does colocation cost in Andorra?
No published wholesale $/kW benchmark exists for Andorra yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Andorra?
Commercial electricity in Andorra is $0.173 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Andorra?
On power alone, Spain ($0.134/kWh) run below Andorra. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Andorra market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Andorra?
Coloprice tracks 1 data centers in Andorra: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →
