24 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Spain: Q3 2026 Price Index

Compare 24 data centers in Spain across 8 operators, 386 MW: capacity, status, certifications, facilities and colocation pricing context.

24 facilities386 MW tracked8 operators

Colocation pricing: Spain & other markets — The Colocation Price Index → · Best data centers in Spain →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.134

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 8 Tier III/IV · 1 AI-ready · 386+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Spain· · ·$0.13424
France· · ·$0.18553

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Equinix is currently the only operator represented in the Madrid market in the catalog, with four disclosed IBX facilities and zero published power capacity in MW — a familiar pattern across the operator's European estate, where site-level capacity sits behind a sales inquiry rather than a public spec sheet. None of the four is flagged AI-ready or holds an Uptime or TIA-942 certification; MD2, the largest by floor space, carries Spain's ENS national security accreditation alongside the broader ISO/PCI DSS/SOC stack. Commercial power at $0.134/kWh sits below Germany's $0.283 and France's $0.185, helped by Spain's build-out of solar and wind capacity, which two of the four sites cite directly as their renewable-energy source via virtual power purchase agreements. Coverage here is a single operator's public disclosure, not the full Madrid market — an early marker for a country the catalog has only just begun to track.

Frequently asked questions

How much does colocation cost in Spain?

No published wholesale $/kW benchmark exists for Spain yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 24 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Spain?

Commercial electricity in Spain is $0.134 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 24 facilities in our catalog, 8 of them announced or under construction.

Where is colocation cheaper near Spain?

Spain sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Spain market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Spain?

Coloprice tracks 24 data centers in Spain: 16 operational with 198 MW of published IT power, 0 under construction and 8 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Equinix MD1EquinixSpainMadrid42DOperational
Equinix MD2EquinixSpainMadrid45DOperational
Equinix MD3xEquinixSpainMadrid40DOperational
Equinix MD6EquinixSpainMadrid43DOperational
MAD1Digital Realty (Interxion)SpainMadrid40DOperational
MAD2Digital Realty (Interxion)SpainMadrid40DOperational
MAD3Digital Realty (Interxion)SpainMadrid40DOperational
MAD4Digital Realty (Interxion)SpainMadrid40DOperational
BCN1Digital Realty (Interxion)SpainBadalona19EOperational
NTT Madrid 1 Data CenterNTT Global Data CentersSpainLas Rozas de Madrid6.925EOperational
CyrusOne MAD1CyrusOneSpainMadrid1830EOperational
Iron Mountain MAD-1Iron MountainSpainSan Fernando de Henares (Madrid)3III*47DOperational
Iron Mountain MAD-2Iron MountainSpainSan Fernando de Henares (Madrid)10III*40DAnnounced
Iron Mountain MAD-3Iron MountainSpainSan Fernando de Henares (Madrid)10III*40DAnnounced
Iron Mountain MAD-4Iron MountainSpainSan Fernando de Henares (Madrid)10III*40DAnnounced
Iron Mountain MAD-5Iron MountainSpainSan Fernando de Henares (Madrid)10III*40DAnnounced
Iron Mountain MAD-6Iron MountainSpainSan Fernando de Henares (Madrid)36III*41DAnnounced
Iron Mountain MAD-7Iron MountainSpainSan Fernando de Henares (Madrid)36III*41DAnnounced
Iron Mountain MAD-8Iron MountainSpainSan Fernando de Henares (Madrid)36III*41DAnnounced
Global Switch Madrid 1Global SwitchSpainMadrid1424·Operational
Global Switch Madrid 2Global SwitchSpainMadrid5624·Operational
Data4 MAD01Data4SpainAlcobendas (Madrid)5024·Operational
Data4 MAD02Data4SpainSan Agustín del Guadalix (Madrid)5024·Operational
Prime Data Centers MAD01-01Prime Data CentersSpainAlcobendas (Madrid)4024EAnnounced