1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Argentina: Q3 2026 Price Index

Compare 1 data centers in Argentina across 1 operators: capacity, status, certifications, facilities and colocation pricing context.

1 facilities1 operators

Colocation pricing: Argentina & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.092

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Argentina· · ·$0.0921
Chile· · ·$0.21226
Brazil· · ·$0.12281
Peru· · ·$0.1673

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Argentina enters the catalog through Cirion Technologies' Buenos Aires data center (BUE1), a carrier-neutral facility connecting national ISPs including Claro Convergia, Telecentro, Metrotel and Iplan alongside international peers such as Google, Amazon, Meta and Telefónica. Cirion — the former CenturyLink/Lumen Latin America business, now an independent operator — lists Buenos Aires as its only named Argentine site; the operator's own per-facility power and floor-space figures for BUE1 duplicate figures shown on unrelated city pages on Cirion's site (an apparent template bug), so they are omitted here rather than reported as fact. The catalog's $0.092/kWh benchmark is a general business-electricity average (GlobalPetrolPrices, Dec 2025); Argentina's tariff system has undergone repeated subsidy reforms in recent years, so this figure is a snapshot rather than a stable long-run reference. Neighboring catalog markets are Chile, Brazil and Peru.

Frequently asked questions

How much does colocation cost in Argentina?

No published wholesale $/kW benchmark exists for Argentina yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Argentina?

Commercial electricity in Argentina is $0.092 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Argentina?

Argentina sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Argentina market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Argentina?

Coloprice tracks 1 data centers in Argentina: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Cirion Buenos Aires (BUE1)Cirion TechnologiesArgentinaBuenos Aires7·Operational