▮▮Coloprice
← All countries

5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Brazil: Q3 2026 Price Index

Compare 5 data centers in Brazil across 1 operators, 7 MW: capacity, status, certifications, facilities and colocation pricing context.

5 facilities7 MW tracked1 operators

Colocation pricing: Brazil & other markets — The Colocation Price Index → · Best data centers in Brazil →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.159

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 7+ MW · sources

Why prices sit where they do

Aligned Data Centers is the only operator disclosed in Brazil so far, running five ODATA-heritage colocation sites across the São Paulo and Rio de Janeiro metros: SP-01 in Santana de Parnaíba (the only one with LEED Gold), SP-02 in Hortolândia near the Campinas tech corridor, SP-03 in Barueri, SP-04 in Osasco (the operator’s AI-optimized, liquid-cooled site in the country), and RJ-01 in São João de Meriti. Generator and UPS capacity per site runs from roughly 1 to 2 MW, reflecting a multi-tenant retail colocation model rather than hyperscale campuses. Business electricity averages $0.159/kWh (GlobalPetrolPrices, Dec 2025), among the more moderate commercial rates in Latin America thanks to a hydro-dominated grid, though state-level ICMS taxes push retail prices up. With no Uptime Tier or hyperscale-scale capacity yet disclosed, Brazil remains an early-stage entry in the catalog, anchored by a single operator’s retail colocation footprint rather than a competitive multi-operator hyperscale cluster.

Frequently asked questions

How much does colocation cost in Brazil?

No published wholesale $/kW benchmark exists for Brazil yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Brazil?

Commercial electricity in Brazil is $0.159 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 0 of them announced or under construction.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Brazil market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Brazil?

Coloprice tracks 5 data centers in Brazil: 5 operational with 7 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Aligned SP-01 (Santana de Parnaíba)Aligned Data CentersBrazilSantana de Parnaíba136DOperational
Aligned SP-02 (Hortolândia)Aligned Data CentersBrazilHortolândia1.3337DOperational
Aligned SP-03 (Barueri)Aligned Data CentersBrazilBarueri1.622EOperational
Aligned SP-04 (Osasco)Aligned Data CentersBrazilOsasco227EOperational
Aligned RJ-01 (São João de Meriti)Aligned Data CentersBrazilSão João de Meriti1.3331EOperational