▮▮Coloprice
← All countries

2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in DR Congo: Q3 2026 Price Index

Compare 2 data centers in DR Congo across 2 operators, 4 MW: capacity, status, certifications, facilities and colocation pricing context.

2 facilities4 MW tracked2 operators

Colocation pricing: DR Congo & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.084

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · 4+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
DR Congo· · ·$0.0842
South Africa· · ·$0.14426

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

DR Congo's catalog entries are both in Kinshasa: Raxio Group's DRC1, launched in 2024 with 400 racks and 1.5 MW of IT power, holding both Uptime Institute Tier III Design Documents and Constructed Facility awards, and Open Access Data Centres' OADC-TEXAF Kinshasa (FIH1), a 2 MW facility inside TEXAF's Silikin Village complex holding a Design Documents award only. DRC1 is currently the only fully Uptime-certified (design-and-constructed) Tier III facility identified in the country. Business electricity runs $0.084/kWh (GlobalPetrolPrices, Dec 2025), reflecting a grid that draws heavily on hydropower — including the Inga dam complex — though unreliable transmission and limited grid access mean many commercial users, including data centers, rely substantially on diesel backup generation.

Frequently asked questions

How much does colocation cost in DR Congo?

No published wholesale $/kW benchmark exists for DR Congo yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in DR Congo?

Commercial electricity in DR Congo is $0.084 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near DR Congo?

DR Congo sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full DR Congo market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in DR Congo?

Coloprice tracks 2 data centers in DR Congo: 2 operational with 4 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Raxio DRC1Raxio Data Centre SASDR CongoKinshasa1.5III52COperational
OADC-TEXAF Kinshasa (FIH1)Open Access Data Centres (WIOCC) / TEXAFDR CongoKinshasa2III39DOperational