Raxio DRC1

Operational

Raxio DRC1 is a data center (Uptime Tier III, constructed facility certified) in Kinshasa, DR Congo, operated by Raxio Group, with 1.5 MW of published IT capacity, currently operational, opened in 2024.

Raxio Group's enterprise-grade data center in Kinshasa, launched in 2024 with 400 racks and 1.5 MW of IT power, holding both Uptime Institute Tier III Design Documents and Constructed Facility awards.

Raxio DRC1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation

10 of 14 fields published · Operator? Add or correct data →

Units
Operator
Raxio Group
City
Kinshasa, DR Congo
Power, MW
1.5 MW
Cooling
Air
Uptime Tier
III · constructed facility certified
Opened
2024
Floor space
1,056 m²
Racks
400
Uptime Institute Tier III Certification of Design DocumentsUptime Institute Tier III Certification of Constructed Facility

2 sources · data pending on-site verification

C

Coloprice Score

52 out of 100

Class C · #1 of 4 in DR Congo

  • Resilience24/35
  • Compliance0/20
  • Transparency12/20
  • Scale6/15
  • Maturity10/10
How the score is calculated →
Embed score badge
Raxio DRC1 — Coloprice Score 52
<a href="https://coloprice.com/data-centers/dr-congo/kinshasa/raxio-drc1-kinshasa/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/raxio-drc1-kinshasa.svg"
    alt="Raxio DRC1 — Coloprice Score 52" height="64">
</a>

Connectivity: 7 networks and 1 internet exchanges are present in this facility.

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Raxio DRC1 — Best data center in DR Congo 2026
#1 of 4 · See the list →
Raxio DRC1 — Best data center in Kinshasa, DR Congo 2026
#1 of 4 · See the list →

Raxio DRC1, launched in 2024, is an enterprise-grade, carrier-neutral data center in Kinshasa operated by Raxio Group, the pan-African developer that also runs facilities in Angola, Côte d'Ivoire, Ethiopia, Mozambique, Tanzania and Uganda. The operator's published specifications describe a two-floor, 1,056 m² white-space building with capacity for 400 racks and 1.5 MW of IT power, backed by 2 MW of installed cooling and N+1 resilience across power and cooling systems. The Uptime Institute's award registry lists the facility under client Raxio Data Centre SAS and site name "DRC1," with both a Tier III Certification of Design Documents and a Tier III Certification of Constructed Facility — a stronger award than the only other Uptime-registered facility in the country, Open Access Data Centres' Kinshasa site, which holds a Design Documents award only. Raxio positions DRC1 along established regional fibre routes to support domestic and international connectivity.

  • ▮Uptime Institute Tier III: Design Documents + Constructed Facility (as "DRC1")
  • ▮400 racks, 1,056 m² white space, 1.5 MW IT power
  • ▮N+1 power/cooling, 2 MW installed cooling capacity
  • ▮Launched 2024; DR Congo's only Design + Constructed Tier III site

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Kinshasa

Source — Verified against operator sources · data pending on-site verification