Kemet Data Center (Intro Group)

Announced

Kemet Data Center (Intro Group) is a data center in Ain Sokhna, Egypt, operated by Intro Group, with 80 MW of published IT capacity, announced, not yet built.

Planned 80 MW data center in the Integrated Sokhna Industrial Zone of the Suez Canal Economic Zone, Egypt, with a first-phase investment of about US$270 million; Intro Group aims for the first Tier III facility in the zone.

Kemet Data Center (Intro Group) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · planned

4 of 14 fields published · Operator? Add or correct data →

Units
Operator
Intro Group
City
Ain Sokhna, Egypt
Power, MW
80 MW
Cooling
Air

3 sources · data pending on-site verification

—

Coloprice Score

15 out of 100

limited data · #16 of 19 in Egypt

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale11/15
  • Maturity0/10
How the score is calculated →
Embed score badge
Kemet Data Center (Intro Group) — Coloprice Score 15
<a href="https://coloprice.com/data-centers/egypt/ain-sokhna/intro-group-kemet-sokhna/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/intro-group-kemet-sokhna.svg"
    alt="Kemet Data Center (Intro Group) — Coloprice Score 15" height="64">
</a>

Kemet is Intro Group's planned data center in the Integrated Sokhna Industrial Zone, part of the Suez Canal Economic Zone east of Cairo. In September 2026 the company reviewed implementation plans with Egypt's ICT minister and said the first phase would involve about US$270 million of investment, within a facility designed for a total of 80 MW across roughly 80,000 square meters and two phases. Intro states that engineering designs are complete and that contracts with equipment and systems suppliers have been signed, and that the site will be partly powered by solar energy. The operator aims for the first Tier III facility in the zone; no certificate has been published. The project was first announced in 2024 in a memorandum with Oman Data Park, at a larger headline figure, and later reports describe a phased build with a completion target around 2030. The relationship between the earlier and current investment figures has not been explained, so the listing records only the capacity and phase figures the company itself has stated. Planned services include cloud and IoT offerings. Construction start and opening dates have not been announced.

  • ▮Planned capacity of 80 MW in two phases on about 80,000 sqm
  • ▮First-phase investment of about US$270 million
  • ▮Located in the Integrated Sokhna Industrial Zone, Suez Canal Economic Zone
  • ▮Partly solar powered
  • ▮Aims to be the first Tier III facility in the zone (not yet certified)

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release: