Data Center Colocation Costs in Equatorial Guinea: Q3 2026 Price Index

Compare 2 data centers in Equatorial Guinea across 2 operators: capacity, status, certifications, facilities and colocation pricing context.

2 facilities2 operators

Colocation pricing: Equatorial Guinea & other markets — The Colocation Price Index →

Data centers

FacilityOperatorCountryCityCerts ⓘStatus
SIPOPO DATACENTERGestor de Infraestructuras de Telecomunicaciones de Guinea EcuatorialEquatorial GuineaMalabo———data pendingOperational
GITGE Data CenterGITGE (Gestor de Infraestructuras de Telecomunicaciones de Guinea Ecuatorial)Equatorial GuineaMalabo———data pendingOperational
All 2 facilities, A–Z

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

· · ·

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Equatorial Guinea· · ·—2—
Cameroon· · ·$0.1887—
Gabon· · ·$0.1772—
Nigeria· · ·$0.04928—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Equatorial Guinea, a small oil-producing state in Central Africa, enters the catalog through GITGE (Gestor de Infraestructuras de Telecomunicaciones de Guinea Ecuatorial), the state-linked manager of the country's submarine cable landings (ACE, SAIL, Ceiba). GITGE's own site lists colocation and infrastructure-leasing services from centers in Malabo and Bata, though it does not publicly name or give a precise street address for the technical site itself, only its Malabo corporate office. No public power tariff for data-centre customers has been identified from GITGE or the national utility, so no benchmark is published. The market is essentially a single state-linked operator serving government and telecom-interconnection demand rather than a competitive commercial colocation sector.

Frequently asked questions

How much does colocation cost in Equatorial Guinea?

No published wholesale $/kW benchmark exists for Equatorial Guinea yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Where is colocation cheaper near Equatorial Guinea?

Equatorial Guinea sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Equatorial Guinea market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Equatorial Guinea?

Coloprice tracks 2 data centers in Equatorial Guinea: 2 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.