atNorth FIN04 Myllykoski Mega Site

Under construction

atNorth FIN04 Myllykoski Mega Site is a data center in Kouvola (Myllykoski), Finland, operated by atNorth, with 430 MW of published IT capacity, currently under construction.

Large greenfield atNorth campus under construction in Myllykoski, Kouvola, planned for 430 MW total capacity with waste heat recycled through the local KSS heating plant.

atNorth FIN04 Myllykoski Mega Site — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction

7 of 14 fields published · Operator? Add or correct data →

Units
Operator
atNorth
City
Kouvola (Myllykoski), Finland
Power, MW
430 MW
Cooling
Liquid
Max density
100 kW/rack
Renewable energy
100%
AI-ready
Yes

1 sources · data pending on-site verification

E

Coloprice Score

28 out of 100

Class E · #10 of 31 in Finland

  • Resilience0/35
  • Compliance0/20
  • Transparency10/20
  • Scale15/15
  • Maturity3/10
How the score is calculated →
Embed score badge
atNorth FIN04 Myllykoski Mega Site — Coloprice Score 28
<a href="https://coloprice.com/data-centers/finland/kouvola/atnorth-fin04-myllykoski-kouvola/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/atnorth-fin04-myllykoski-kouvola.svg"
    alt="atNorth FIN04 Myllykoski Mega Site — Coloprice Score 28" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

atNorth FIN04 Myllykoski Mega Site — Top 10 data centers in Finland 2026
#10 of 31 · See the list →

FIN04 is atNorth's mega campus in Myllykoski, Kouvola, about 139 km north-east of Helsinki, and the operator's fourth site in Finland. The campus covers 65 hectares and is stated at 430 MW of power capacity, with a path to several hundred additional MW; it targets both colocation and build-to-suit customers. atNorth's page said the site would be ready for operation in the first half of 2026. Design values listed include a PUE of 1.2 or lower, an average rack density of 40 kW and support for 100+ kW liquid-cooled racks, chilled-water cooling with free-cooling compressors at N+1, and N+2 fan-wall cooling in a liquid-cooling-ready white space. Power distribution is N+1 with UPS and generator backup and fuel for at least 48 hours. Waste heat is to be recycled through the KSS heating plant into local district heating and hot water, with energy partner KSS Energia. Two diverse fiber entry points and two meet-me rooms are listed. Year opened and certifications are not published for this site.

  • ▮430 MW campus power capacity on 65 hectares, with a path to several hundred additional MW.
  • ▮Design PUE of 1.2 or lower; average rack density 40 kW, 100+ kW liquid-cooled racks supported.
  • ▮Waste heat to be recycled through the KSS heating plant for local district heating.
  • ▮Two diverse fiber entry points and two meet-me rooms.
  • ▮Operator targets operation in the first half of 2026; status shown here follows our last verified record.

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification