▮▮Coloprice

CyrusOne PAR1

Operational

1 Boulevard Arago, 91320 Wissous

CyrusOne PAR1 is a data center in Wissous, France, operated by CyrusOne, with 4.5 MW of published IT capacity, currently operational.

CyrusOne's first data center in France, in Wissous near Orly, with Phase 1 (4.5 MW) operational toward a planned 27 MW across six data halls.

CyrusOne PAR1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
CyrusOne
City
Wissous, France
Power, MW
4.5 MW
Cooling
Air
Floor space
10,396 m²
Renewable energy
100%
E

Coloprice Score

27 out of 100

Class E · #30 of 53 in France

  • Resilience0/35
  • Compliance0/20
  • Transparency12/20
  • Scale8/15
  • Maturity7/10
How the score is calculated →
Embed score badge
CyrusOne PAR1 — Coloprice Score 27
<a href="https://coloprice.com/data-centers/france/wissous/cyrusone-par1-wissous/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/cyrusone-par1-wissous.svg"
    alt="CyrusOne PAR1 — Coloprice Score 27" height="64">
</a>

CyrusOne's PAR1 at 1 Boulevard Arago in Wissous, near Orly south of Paris, is the operator's first data center in France. The campus is being built in three phases toward six data halls and 27 MW of total IT capacity; Phase 1, covering 4.5 MW of the eventual capacity, is operational, while Phase 2 (6.9 MW) is not yet live and Phase 3 still awaits environmental and planning authorization. At full build the technical footprint reaches 10,396 sqm within a 52,240 sqm total facility. Cooling uses a closed-loop system tuned for optimized operating temperatures, and power arrives through an active/active dual-redundant supply. Data halls sit on 900 mm heavy-duty raised floors with 3,000 mm of clear height. CyrusOne has run the site on 100% renewable electricity since 2021 and operates a Zero Waste to Landfill program, with 5,250 sqm of planned green space and roughly 127 trees as part of the build-out. Exterior cladding uses FSC- and PEFC-certified wood. The site is staffed 24/7/365 with layered security.

  • Phase 1 (4.5 MW) operational; planned 27 MW across six data halls at full build
  • 10,396 sqm technical space within a 52,240 sqm campus
  • 100% renewable electricity since 2021; Zero Waste to Landfill
  • Active/Active dual redundant power supply
  • CyrusOne's first data center in France

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification