ST Digital Data Center Nkok

Operational

ST Digital Data Center Nkok is a data center in Libreville (Nkok SEZ), Gabon, operated by ST Digital, with 1 MW of published IT capacity, currently operational, opened in 2026.

ST Digital's Nkok Special Economic Zone facility near Libreville is described by the operator as Gabon's first sovereign colocation data center, inaugurated in July 2026 with 1 MW of power and room for up to 3,000 servers.

ST Digital Data Center Nkok — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation

7 of 14 fields published · Operator? Add or correct data →

Units
Operator
ST Digital
City
Libreville (Nkok SEZ), Gabon
Power, MW
1 MW
Cooling
Air
Opened
2026
Floor space
65 m²

2 sources · data pending on-site verification

E

Coloprice Score

23 out of 100

Class E · #2 of 2 in Gabon

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale5/15
  • Maturity9/10
How the score is calculated →
Embed score badge
ST Digital Data Center Nkok — Coloprice Score 23
<a href="https://coloprice.com/data-centers/gabon/libreville/st-digital-datacenter-nkok-libreville/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/st-digital-datacenter-nkok-libreville.svg"
    alt="ST Digital Data Center Nkok — Coloprice Score 23" height="64">
</a>

Connectivity: 1 networks and 0 internet exchanges are present in this facility.

Gabon's first purpose-built colocation facility opened in mid-2026, when pan-African operator ST Digital inaugurated a data center inside the Nkok Special Economic Zone, roughly 27 km from Libreville. Construction began with a groundbreaking in August 2025 under a memorandum with Gabon's Ministry of the Digital Economy, which secured preferential hosting rates for government-backed startups. The facility launched with a 65 sqm colocation white-space in its first phase, built for up to 3,000 physical servers on 1 MW of electrical capacity, fed by a 15 kV utility connection backed by diesel generators and UPS, with a share of consumption drawn from an on-site photovoltaic plant. ST Digital markets the site as Gabon's first "sovereign" Tier III-standard data center — a self-described rating, not an Uptime Institute or TIA-942 award. Direct connectivity to the ACE and SAT-3/WASC subsea cables positions it for banks, public administrations, telecom operators, industrials, fintechs and startups. It is ST Digital's third Central/West African site alongside its already-cataloged Douala (Cameroon) and Côte d'Ivoire facilities, and Gabon's second data center overall after the existing Moov Africa Gabon site in Libreville.

  • ▮First self-described "sovereign" colocation data center in Gabon, inaugurated July 2026
  • ▮1 MW capacity, up to 3,000 physical servers, 65 sqm initial colocation floor
  • ▮Direct connectivity to the ACE and SAT-3/WASC subsea cables
  • ▮Partly powered by an on-site solar plant
  • ▮Government MoU gives startups preferential hosting rates

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Libreville (Nkok SEZ)

FacilityOperatorPower, MWTierStatus
ST Digital Data Center NkokST Digital1—Operational
DC1, Cenacom BuildingMoov Africa Gabon Telecom—IIIOperational