▮▮Coloprice
← All countries

3 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Ghana: Q3 2026 Price Index

Compare 3 data centers in Ghana across 3 operators: capacity, status, certifications, facilities and colocation pricing context.

3 facilities3 operators

Colocation pricing: Ghana & other markets — The Colocation Price Index → · Best data centers in Ghana →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.175

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Ghana· · ·$0.1753
Nigeria· · ·$0.04914

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Ghana's catalog entry is ONIX's Accra facility, a carrier-neutral, Uptime Institute Tier IV Certified Constructed Facility certified in 2021 — the only Tier IV site disclosed in West Africa outside Nigeria. ONIX, incorporated in London, has not published the Accra site's IT power capacity or floor area in sources this catalog can verify independently, though the operator has separately stated plans for a second West African site in Dakar, Senegal. Business electricity runs $0.175/kWh (GlobalPetrolPrices, Dec 2025), reflecting Ghana's hydro-thermal generation mix and periodic dumsor-style supply constraints that push resilience-minded operators toward Tier IV design and heavy backup generation. Accra's build-out mirrors the broader West African pattern of a single flagship Tier IV site anchoring a market otherwise served by telecom-operator server rooms.

Frequently asked questions

How much does colocation cost in Ghana?

No published wholesale $/kW benchmark exists for Ghana yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Ghana?

Commercial electricity in Ghana is $0.175 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Ghana?

On power alone, Nigeria ($0.049/kWh) run below Ghana. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Ghana market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Ghana?

Coloprice tracks 3 data centers in Ghana: 3 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
ONIX Accra #1ONIX Data Centres Ghana LimitedGhanaAccraIV39DOperational
Equinix AC1 IBXEquinixGhanaAccra12·Operational
Digital Realty ACR2Digital RealtyGhanaAccra27EOperational