1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Gibraltar: Q3 2026 Price Index
Compare 1 data centers in Gibraltar across 1 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Gibraltar & other markets — The Colocation Price Index →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Continent 8 Gibraltar Data Center | Continent 8 Technologies | Gibraltar | Gibraltar | — | — | — | data pending | Operational |
Nothing matches the filters
All 1 facilities, A–Z
- Continent 8 Gibraltar Data Center Gibraltar
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.235
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Gibraltar | · · · | $0.235 | 1 | — |
| Spain | · · · | $0.134 | 93 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Gibraltar's sole catalogued facility is Continent 8 Technologies' data center built inside the Rock of Gibraltar itself, in a former UK Ministry of Defence facility — a distinctive physical setup shared with few other data centers worldwide. As in the Isle of Man, the driver is Gibraltar's licensed online-gaming sector, which requires infrastructure to sit within the jurisdiction's own regulatory perimeter. Electricity is billed under the Gibraltar Electricity Authority's Tariff No. 4 (Commercial), which as of its August 2026 schedule combines a base unit cost with a separate Flexible Cost Adjustment surcharge, plus fixed standing and meter charges — a tariff structure exposed to fuel-cost swings on a small, self-contained grid. Gibraltar's British Overseas Territory status and separate regulatory regime from both the UK and Spain make it a jurisdictional rather than a scale play: colocation demand here follows licensing decisions, not general enterprise or cloud growth.
Frequently asked questions
How much does colocation cost in Gibraltar?
No published wholesale $/kW benchmark exists for Gibraltar yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Gibraltar?
Commercial electricity in Gibraltar is $0.235 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Gibraltar?
On power alone, Spain ($0.134/kWh) run below Gibraltar. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Gibraltar market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Gibraltar?
Coloprice tracks 1 data centers in Gibraltar: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →
