▮▮Coloprice

SoftBank Sakai AX Factory AI Data Center

Under construction

SoftBank Sakai AX Factory AI Data Center is a data center in Sakai, Osaka, Japan, operated by SoftBank Corp., with 140 MW of published IT capacity, currently under construction.

SoftBank's AI-dedicated data center under construction inside a former Sharp LCD panel plant in Sakai, Osaka, designed for roughly 140 MW of power and 110 exaFLOPS of AI compute.

SoftBank Sakai AX Factory AI Data Center — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
SoftBank Corp.
City
Sakai, Osaka, Japan
Power, MW
140 MW
Cooling
Air
Floor space
840,000 m²
AI-ready
Yes
—

Coloprice Score

23 out of 100

limited data · #50 of 110 in Japan

  • Resilience0/35
  • Compliance0/20
  • Transparency7/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
SoftBank Sakai AX Factory AI Data Center — Coloprice Score 23
<a href="https://coloprice.com/data-centers/japan/sakai/softbank-osaka-sakai-ax-factory/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/softbank-osaka-sakai-ax-factory.svg"
    alt="SoftBank Sakai AX Factory AI Data Center — Coloprice Score 23" height="64">
</a>

SoftBank Corp. is converting a large portion of Sharp's former Sakai liquid-crystal-display plant, on a roughly 450,000 sqm site in Sakai City, Osaka Prefecture, into a dedicated AI data center the company calls the AX Factory. The acquisition of the land and buildings was agreed in March 2025, and SoftBank's own May 2026 medium-term growth strategy names a target of about 140 MW of power capacity and 110 exaFLOPS of AI compute for the site, figures that have moved across successive company statements as the project scope firmed up. A separate portion of the same former Sharp campus was bought independently by KDDI for its own, already-operating Osaka Sakai data center, so the two are distinct facilities on one former industrial site rather than a single shared building. SoftBank has not published a street address, only the general Sakai City location, nor has it confirmed a firm operational date or any third-party tier certification; the company's own figures describe scale and intent rather than a finished specification. The project sits alongside a wave of Japanese telecom-operator investment in domestic AI infrastructure, aimed at reducing reliance on overseas cloud capacity for large language model training and inference workloads serving the Japanese market.

  • ▮~140 MW planned power capacity, 110 exaFLOPS of AI compute (SoftBank's own May 2026 figures)
  • ▮Built inside a former Sharp LCD plant on a ~450,000 sqm site in Sakai, Osaka
  • ▮Distinct from KDDI's separate data center on another portion of the same former Sharp campus
  • ▮No confirmed operational date; power/compute figures have shifted across SoftBank's own releases
  • ▮Part of a broader wave of Japanese telecom self-built AI infrastructure

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Sakai, Osaka