1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Red Hill, Limuru (Nairobi area): 1 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.171
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
Frequently asked questions
How much does colocation cost in Red Hill, Limuru (Nairobi area), Kenya?
No published wholesale $/kW benchmark exists for Red Hill, Limuru (Nairobi area), Kenya yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Red Hill, Limuru (Nairobi area), Kenya?
Commercial electricity in Red Hill, Limuru (Nairobi area), Kenya is $0.171 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Red Hill, Limuru (Nairobi area), Kenya market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Safaricom Red Hill Data Center | Safaricom PLC | — | III | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.