▮▮Coloprice
← Nepal

1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Lalitpur: 1 facilities, colocation pricing

How many data centers are in Lalitpur?

Coloprice tracks 1 data centers in Lalitpur, Nepal: 1 operational, 0 under construction and 0 announced, run by 1 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.060

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Lalitpur, Nepal· · ·$0.0601—
India· · ·$0.109306—
Bhutan· · ·$0.0172—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Lalitpur?

Coloprice tracks 1 data centers in Lalitpur, Nepal: 1 operational, 0 under construction and 0 announced, run by 1 operators.

Which operators run data centers in Lalitpur?

By number of facilities tracked: Ncell Axiata (1).

How much does colocation cost in Lalitpur, Nepal?

No published wholesale $/kW benchmark exists for Lalitpur, Nepal yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Lalitpur, Nepal?

Commercial electricity in Lalitpur, Nepal is $0.060 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Lalitpur, Nepal?

On power alone, Bhutan ($0.017/kWh) run below Lalitpur, Nepal. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Lalitpur, Nepal market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
Ncell Axiata Nakkhu IDCNcell Axiata—3Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.