8 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Lekki, Lagos: 8 facilities, colocation pricing

Colocation pricing and providers in Lekki, Lagos →

How many data centers are in Lekki, Lagos?

Coloprice tracks 8 data centers in Lekki, Lagos, Nigeria: 7 operational, 1 under construction and 0 announced, run by 5 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.049

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 3 Tier III/IV · 0 AI-ready · 24+ MW · sources

Frequently asked questions

How many data centers are in Lekki, Lagos?

Coloprice tracks 8 data centers in Lekki, Lagos, Nigeria: 7 operational, 1 under construction and 0 announced, run by 5 operators.

Which operators run data centers in Lekki, Lagos?

By number of facilities tracked: Equinix (3), Digital Realty (2), Open Access Data Centres (WIOCC) (1), 21st Century Technologies Limited (21CTL) (1), MainOne (1).

What is the total data center power capacity in Lekki, Lagos?

Facilities that publish capacity add up to 24 MW (1 of 8 sites disclose a figure); the largest published site is OADC LOS1 (Lekki) with 24 MW.

How much does colocation cost in Lekki, Lagos, Nigeria?

No published wholesale $/kW benchmark exists for Lekki, Lagos, Nigeria yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 8 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Lekki, Lagos, Nigeria?

Commercial electricity in Lekki, Lagos, Nigeria is $0.049 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 8 facilities in our catalog, 1 of them announced or under construction.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Lekki, Lagos, Nigeria market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Lagos vs Lekki, LagosAbuja vs Lekki, LagosIkeja, Lagos vs Lekki, Lagos

Data centers

FacilityOperatorPower, MWTierStatus
Equinix LG1Equinix——Operational
Equinix LG2Equinix——Operational
Equinix LG3Equinix——Under construction
Digital Realty LKK1Digital Realty——Operational
Digital Realty LKK2Digital Realty——Operational
OADC LOS1 (Lekki)Open Access Data Centres (WIOCC)24IIIOperational
21st Century Digital Hub Data Centre 1 (DHDX)21st Century Technologies Limited (21CTL)—IVOperational
MainOne Lekki Data CentreMainOne—IIIOperational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.