Lefdal Mine Datacenter

Operational

Gate 1 nr 101, 6700 Måløy, Norway

Lefdal Mine Datacenter is a data center (Uptime Tier III, design certified) in Kjølsdalen (Måløy), Norway, operated by Lefdal Mine Datacenter, currently operational.

Lefdal Mine Datacenter is a large-scale, phased data center built inside a former olivine mine on Norway's west coast, using fjord water for cooling and holding Uptime Tier III design certification.

Lefdal Mine Datacenter — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Lefdal Mine Datacenter
City
Kjølsdalen (Måløy), Norway
Power, MW
Cooling
Air
Uptime Tier
III · design certified
Uptime Institute Tier III Certification of Design DocumentsISO 9001:2015ISO 14001:2015ISO 45001:2023ISO 27001:2023
D

Coloprice Score

37 out of 100

Class D · #5 of 12 in Norway

  • Resilience16/35
  • Compliance12/20
  • Transparency2/20
  • Scale0/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Lefdal Mine Datacenter — Coloprice Score 37
<a href="https://coloprice.com/data-centers/norway/kjolsdalen/lefdal-mine-datacenter-kjolsdalen/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/lefdal-mine-datacenter-kjolsdalen.svg"
    alt="Lefdal Mine Datacenter — Coloprice Score 37" height="64">
</a>

Connectivity: 3 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →

Lefdal Mine Datacenter occupies a former olivine mine on Norway's western coast near Måløy, converted into a large-scale, phased colocation facility. Rather than a single building, the data center is built out level by level inside the mountain, following IBM Level 3 construction standards referenced in the operator's own compliance documentation; the first phase achieved Uptime Institute Tier III design certification. The site is also certified to ISO 14001:2015, ISO 9001:2015, ISO 45001:2023 and ISO 27001:2023. Cooling draws on the adjacent fjord: cold water is pumped through heat exchangers into a closed freshwater circuit beneath a raised floor, and the operator also offers direct-liquid and immersion cooling for high-density deployments. Lefdal markets substantial long-term expansion headroom — up to 120,000 square meters of potential whitespace and 200 MW of eventual capacity, with a 60 MW expansion announced in 2024 — though it does not publish a single current operational power figure, so this catalog records power and floor space as unconfirmed rather than using the long-term targets.

  • Built inside a former olivine mine, phased level-by-level construction
  • Uptime Institute Tier III Certification of Design Documents
  • ISO 9001 / 14001 / 27001 / 45001 certified
  • Fjord-water cooling plus direct-liquid/immersion options
  • Long-term expansion targets up to 200 MW / 120,000 sqm (not yet built out)

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract