3 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Lima: 3 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.167
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 21+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Lima, Peru | · · · | $0.167 | 3 | — |
| Chile | · · · | $0.212 | 26 | — |
| Colombia | · · · | $0.276 | 18 | — |
| Brazil | · · · | $0.122 | 81 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Lima, Peru?
No published wholesale $/kW benchmark exists for Lima, Peru yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Lima, Peru?
Commercial electricity in Lima, Peru is $0.167 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Lima, Peru?
On power alone, Brazil ($0.122/kWh) run below Lima, Peru. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Lima, Peru market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Equinix LM1 IBX | Equinix | 0.7 | — | Operational |
| Cirion Lima (LIM1) | Cirion Technologies | — | — | Operational |
| Cirion Lima (LIM2) | Cirion Technologies | 20 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.