10 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Serbia: Q3 2026 Price Index
Compare 10 data centers in Serbia across 10 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Serbia & other markets — The Colocation Price Index → · Best data centers in Serbia → · Data center companies in Serbia · Colocation pricing and providers in Serbia →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Orion Telekom Data Center Belgrade | Orion Telekom | Serbia | Belgrade | — | — | ISO 27001ISO 22301+2 | data pending | Operational |
| mts Data Center Belgrade | Telekom Srbija (mts) | Serbia | Belgrade | — | — | ISO 9001ISO 27001+3 | data pending | Operational |
| State Data Centre Kragujevac | Office for IT and eGovernment (Republic of Serbia) | Serbia | Kragujevac | — | — | EN 50600 Cla… | data pending | Operational |
| UNLIMITED.RS Data Center | UNLIMITED.RS (United Internet Ltd) | Serbia | Belgrade | — | — | — | data pending | Operational |
| CETIN Data Center Belgrade | CETIN | Serbia | Belgrade | — | — | — | data pending | Operational |
| Akton Data Center Belgrade | Akton Communications and Networks | Serbia | Belgrade | — | — | — | data pending | Operational |
| Serbia BroadBand | Serbia BroadBand d.o.o. | Serbia | Belgrade | — | — | — | data pending | Operational |
| Ninet DC Nis | NiNet Company DOO | Serbia | Nis | — | — | — | data pending | Operational |
| Telekom Srbija data centar | TSSRB - Telekom Srbija | Serbia | Belgrade | — | — | — | data pending | Operational |
| BeotelNet Data Center | BeotelNet-ISP d.o.o | Serbia | Belgrade | — | — | — | data pending | Operational |
Nothing matches the filters
All 10 facilities, A–Z
- Akton Data Center Belgrade Belgrade
- BeotelNet Data Center Belgrade
- CETIN Data Center Belgrade Belgrade
- mts Data Center Belgrade Belgrade
- Ninet DC Nis Nis
- Orion Telekom Data Center Belgrade Belgrade
- Serbia BroadBand Belgrade
- State Data Centre Kragujevac Kragujevac
- Telekom Srbija data centar Belgrade
- UNLIMITED.RS Data Center Belgrade
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.155
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Serbia | · · · | $0.155 | 10 | — |
| Romania | · · · | $0.285 | 30 | — |
| Bulgaria | · · · | $0.396 | 18 | — |
| Croatia | · · · | $0.184 | 9 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Serbia's catalog centers on Belgrade: incumbent Telekom Srbija's mts Data Center, offering telehousing self-declared to Tier 3/4 standards with 2N+1 power redundancy, and Orion Telekom's premium colocation facility in Zemun Polje, built for 8kW+ AI/cloud-density racks on 100% green energy from the Đerdap 1 hydro plant plus on-site solar. Three more New Belgrade sites round out the picture: Unlimited.rs on Omladinskih Brigada street, CETIN's carrier-neutral telehousing facility a block away (claiming 99.9999% availability), and a Ušće Business Centre site run by regional operator Akton. None of the five carries an independent Uptime Institute award on record, and none discloses IT power capacity or floor area. Business electricity runs $0.155/kWh (GlobalPetrolPrices, Dec 2025), reflecting state utility EPS's coal- and hydro-heavy generation mix. Serbia's position at the crossroads of Central and Southeast Europe makes it a market to watch as the wider Balkans region builds out disclosed capacity.
Frequently asked questions
How much does colocation cost in Serbia?
No published wholesale $/kW benchmark exists for Serbia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 10 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Serbia?
Commercial electricity in Serbia is $0.155 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 10 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Serbia?
Serbia sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Serbia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Serbia?
Coloprice tracks 10 data centers in Serbia: 10 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →
