9 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Croatia: Q3 2026 Price Index
Compare 9 data centers in Croatia across 9 operators, 2 MW: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Croatia & other markets — The Colocation Price Index → · Best data centers in Croatia → · Data center companies in Croatia · Colocation pricing and providers in Croatia →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| DC North | DC North d.o.o. | Croatia | Varaždin | — | III | ISO 9001ISO 14001+4 | 57C | Operational |
| A1 Hrvatska Podatkovni Centar Zagreb | A1 Hrvatska d.o.o. | Croatia | Zagreb | 2 | III | — | 47D | Operational |
| AKD Data Center | AKD d.o.o. | Croatia | Sveta Nedelja | — | III | — | data pending | Operational |
| APIS IT d.o.o. DC JASKA | APIS IT d.o.o. | Croatia | Jastrebarsko | — | III | — | data pending | Operational |
| ZAG1 | Digital Realty (Interxion) | Croatia | Zagreb | — | — | ISO 27001ISO 9001+1 | 26E | Operational |
| Akton Data Center Zagreb | Akton Communications and Networks | Croatia | Zagreb | — | — | — | data pending | Operational |
| SRCE Zagreb | SRCE Zagreb | Croatia | Zagreb | — | — | — | data pending | Operational |
| Vipnet d.o.o. Hrvatska | Univerzalne telekomunikacije d.o.o. | Croatia | Zagreb | — | — | — | data pending | Operational |
| Data Target DC | Data Target d.o.o. | Croatia | Zagreb | — | — | — | data pending | Operational |
Nothing matches the filters
All 9 facilities, A–Z
- A1 Hrvatska Podatkovni Centar Zagreb Zagreb
- AKD Data Center Sveta Nedelja
- Akton Data Center Zagreb Zagreb
- APIS IT d.o.o. DC JASKA Jastrebarsko
- Data Target DC Zagreb
- DC North Varaždin
- SRCE Zagreb Zagreb
- Vipnet d.o.o. Hrvatska Zagreb
- ZAG1 Zagreb
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.184
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 4 Tier III/IV · 0 AI-ready · 2+ MW · sources
How this market compares
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Digital Realty's ZAG1 remains Croatia's only hyperscale-linked facility, positioned as sitting "at the crossroads of west and southeastern Europe." The roughly 3,100 sqm site runs 2N UPS with N+1 cooling redundancy on a 100% renewable, 100% carbon-free energy claim, and carries ISO 27001, ISO 9001 and PCI-DSS certifications. Independent operators have since filled out the market: A1 Hrvatska's €11M, earthquake-hardened Zagreb data center (Uptime Tier III Design, 2 MW/300 cabinets), DC North in Varaždin (the country's only Uptime Tier III Design-and-Constructed site, ISO 9001/14001/20000/27001/22301 plus PCI DSS), AKD Data Center in Sveta Nedelja (also Uptime Tier III Design and Constructed), and a Zagreb site run by regional carrier-neutral operator Akton inside the Megatrend business center. Business electricity runs $0.184/kWh (GlobalPetrolPrices, Dec 2025), roughly in line with Poland's $0.177/kWh, reflecting a still-substantial hydro and gas generation mix.
Frequently asked questions
How much does colocation cost in Croatia?
No published wholesale $/kW benchmark exists for Croatia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 9 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Croatia?
Commercial electricity in Croatia is $0.184 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 9 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Croatia?
Croatia sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Croatia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Croatia?
Coloprice tracks 9 data centers in Croatia: 9 operational with 2 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →