▮▮Coloprice
← All countries

9 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Croatia: Q3 2026 Price Index

Compare 9 data centers in Croatia across 9 operators, 2 MW: capacity, status, certifications, facilities and colocation pricing context.

9 facilities2 MW tracked9 operators

Colocation pricing: Croatia & other markets — The Colocation Price Index → · Best data centers in Croatia → · Data center companies in Croatia · Colocation pricing and providers in Croatia →

Data centers

FacilityOperatorCountryCityCerts ⓘStatus
DC NorthDC North d.o.o.CroatiaVaraždin—IIIISO 9001ISO 14001+457COperational
A1 Hrvatska Podatkovni Centar ZagrebA1 Hrvatska d.o.o.CroatiaZagreb2III—47DOperational
AKD Data CenterAKD d.o.o.CroatiaSveta Nedelja—III—data pendingOperational
APIS IT d.o.o. DC JASKAAPIS IT d.o.o.CroatiaJastrebarsko—III—data pendingOperational
ZAG1Digital Realty (Interxion)CroatiaZagreb——ISO 27001ISO 9001+126EOperational
Akton Data Center ZagrebAkton Communications and NetworksCroatiaZagreb———data pendingOperational
SRCE ZagrebSRCE ZagrebCroatiaZagreb———data pendingOperational
Vipnet d.o.o. HrvatskaUniverzalne telekomunikacije d.o.o.CroatiaZagreb———data pendingOperational
Data Target DCData Target d.o.o.CroatiaZagreb———data pendingOperational
All 9 facilities, A–Z

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.184

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 4 Tier III/IV · 0 AI-ready · 2+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Croatia· · ·$0.1849—
Austria· · ·$0.30246—
Italy· · ·$0.323127—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Digital Realty's ZAG1 remains Croatia's only hyperscale-linked facility, positioned as sitting "at the crossroads of west and southeastern Europe." The roughly 3,100 sqm site runs 2N UPS with N+1 cooling redundancy on a 100% renewable, 100% carbon-free energy claim, and carries ISO 27001, ISO 9001 and PCI-DSS certifications. Independent operators have since filled out the market: A1 Hrvatska's €11M, earthquake-hardened Zagreb data center (Uptime Tier III Design, 2 MW/300 cabinets), DC North in Varaždin (the country's only Uptime Tier III Design-and-Constructed site, ISO 9001/14001/20000/27001/22301 plus PCI DSS), AKD Data Center in Sveta Nedelja (also Uptime Tier III Design and Constructed), and a Zagreb site run by regional carrier-neutral operator Akton inside the Megatrend business center. Business electricity runs $0.184/kWh (GlobalPetrolPrices, Dec 2025), roughly in line with Poland's $0.177/kWh, reflecting a still-substantial hydro and gas generation mix.

Frequently asked questions

How much does colocation cost in Croatia?

No published wholesale $/kW benchmark exists for Croatia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 9 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Croatia?

Commercial electricity in Croatia is $0.184 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 9 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Croatia?

Croatia sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Croatia market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Croatia?

Coloprice tracks 9 data centers in Croatia: 9 operational with 2 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.