▮▮Coloprice

Naver GAK Sejong

Operational

Naver GAK Sejong is a data center in Sejong, South Korea, operated by Naver Cloud, with 47 MW of published IT capacity, currently operational, opened in 2023.

Naver's second self-built data center campus, opened November 2023 in Sejong — designed for up to 600,000 servers and 270 MW at full build, with 47 MW disclosed at opening.

Naver GAK Sejong — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Naver Cloud
City
Sejong, South Korea
Power, MW
47 MW
Cooling
Air
Opened
2023
Floor space
294,000 m²
AI-ready
Yes
LEED Platinum
D

Coloprice Score

36 out of 100

Class D · #7 of 38 in South Korea

  • Resilience0/35
  • Compliance4/20
  • Transparency9/20
  • Scale13/15
  • Maturity10/10
How the score is calculated →
Embed score badge
Naver GAK Sejong — Coloprice Score 36
<a href="https://coloprice.com/data-centers/south-korea/sejong/naver-gak-sejong/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/naver-gak-sejong.svg"
    alt="Naver GAK Sejong — Coloprice Score 36" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Naver GAK Sejong — Top 10 data centers in South Korea 2026
#7 of 38 · See the list →

GAK Sejong is Naver's second self-built data center campus, opened in November 2023 in Jiphyeon-dong, Sejong Special Self-Governing City, about 130 km south of Seoul. The site spans 294,000 square meters — Naver describes it as equivalent to 41 football pitches — split between a multi-story main building and a dedicated server building, engineered to withstand a magnitude-9.0 earthquake down to individual rack level. At full build-out the campus is designed for up to 600,000 servers and 270 MW of power, with per-rack density running from 11 kW in general server rooms to 20 kW in high-density zones; at opening, disclosed power capacity stood at 47 MW, with Naver targeting more than 130 MW by 2029 through a phased expansion. GAK Sejong earned LEED Platinum certification in 2024, Naver's second data center to do so after GAK Chuncheon, using natural-wind cooling units, solar and geothermal generation, and heat recovery for site heating. In late 2025 Naver disclosed a large Nvidia GPU deal to expand AI computing capacity at the site.

  • 294,000 sqm campus, 41 football pitches, opened Nov 2023
  • Designed for 600,000 servers / 270 MW at full build
  • 47 MW disclosed at opening; targeting 130+ MW by 2029
  • LEED Platinum (2024); magnitude-9.0 seismic design
  • Nvidia GPU deal announced 2025 for AI expansion

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release: