LG CNS Jukjeon Data Center is a data center in Yongin (Jukjeon), South Korea, operated by LG CNS, with 100 MW of published IT capacity, currently operational, opened in 2024.

LG CNS's newest and largest data center, an 8-story, 99,070 sqm facility in Yongin near the Pangyo tech corridor, completed in 2024 with 100 MW of designed power capacity.

LG CNS Jukjeon Data Center — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
LG CNS
City
Yongin (Jukjeon), South Korea
Power, MW
100 MW
Cooling
Air
Opened
2024
Floor space
99,070 m²
E

Coloprice Score

30 out of 100

Class E · #12 of 38 in South Korea

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale11/15
  • Maturity10/10
How the score is calculated →
Embed score badge
LG CNS Jukjeon Data Center — Coloprice Score 30
<a href="https://coloprice.com/data-centers/south-korea/yongin/lg-cns-jukjeon-yongin/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/lg-cns-jukjeon-yongin.svg"
    alt="LG CNS Jukjeon Data Center — Coloprice Score 30" height="64">
</a>

LG CNS's Jukjeon data center is a 99,070 square meter, eight-story facility (four floors above ground, four below) built in Yongin, Gyeonggi-do, near the Pangyo tech corridor southeast of Seoul, and constructed by Hyundai Engineering & Construction. LG CNS designed the building for 100 MW of power capacity with a largely column-free floor plan that lets roughly 1,000 racks sit on a single level, and marketed it at completion in 2024 as its largest data center to date. The facility runs a carrier-neutral network model that lets tenants choose their own telecom providers, and its cooling plant automatically adjusts refrigeration modes to outside temperature and humidity to cut wasted power. LG CNS positions Jukjeon alongside its older flagship in Busan as an anchor site for its cloud, AI and IT-outsourcing customers, though the company has not disclosed occupancy, tenant names or investment cost for the newer campus.

  • 99,070 sqm, 8 floors (4 above / 4 below ground)
  • 100 MW designed power capacity
  • ~1,000 racks per floor, column-free layout
  • Built by Hyundai E&C, completed 2024
  • Carrier-neutral network access

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification