▮▮Coloprice
← All countries

2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Tanzania: Q3 2026 Price Index

Compare 2 data centers in Tanzania across 2 operators, 6 MW: capacity, status, certifications, facilities and colocation pricing context.

2 facilities6 MW tracked2 operators

Colocation pricing: Tanzania & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.089

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 6+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Tanzania· · ·$0.0892
Kenya· · ·$0.1719

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Tanzania's catalog entries are both in Dar es Salaam: Raxio Group's TZ1, a planned 6 MW, 800-rack facility set to open in 2026 as the country's first carrier-neutral Tier III data center, and STELLARIX Tanzania's Salasala 1C, an already-operational site holding both Uptime Institute Tier III Design Documents and Constructed Facility awards. A third named facility, Millicom/Tigo's Salasala Data Center Phase-1A, carries only a Design Documents award and is run by a mobile operator rather than a wholesale colocation provider. Business electricity runs $0.089/kWh (GlobalPetrolPrices, Dec 2025), reflecting a grid mix of natural gas and hydropower distributed by state utility TANESCO under tariffs reviewed by the Energy and Water Utilities Regulatory Authority.

Frequently asked questions

How much does colocation cost in Tanzania?

No published wholesale $/kW benchmark exists for Tanzania yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Tanzania?

Commercial electricity in Tanzania is $0.089 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Tanzania?

Tanzania sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Tanzania market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Tanzania?

Coloprice tracks 2 data centers in Tanzania: 1 operational, 1 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Raxio TZ1Raxio GroupTanzaniaDar es Salaam622EUnder construction
STELLARIX Salasala 1C Data CenterSTELLARIX Tanzania LimitedTanzaniaDar es SalaamIII31EOperational