Data Center Colocation Costs in Timor-Leste: Q3 2026 Price Index

Compare 1 data centers in Timor-Leste across 1 operators: capacity, status, certifications, facilities and colocation pricing context.

1 facilities1 operators

Colocation pricing: Timor-Leste & other markets — The Colocation Price Index →

Data centers

FacilityOperatorCountryCityCerts ⓘStatus
Telkomcel Data CenterTelkomcel (Telkom Indonesia International)Timor-LesteDili———data pendingOperational
All 1 facilities, A–Z

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

· · ·

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Timor-Leste· · ·—1—
Indonesia· · ·$0.063204—
Australia$188$0.252168—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Timor-Leste enters the catalog through Telkomcel, the Telkom Indonesia International (Telin) mobile and ICT brand, which operates a data center from its headquarters building on Rua Presidente Nicolau Lobato in Dili. The operator's own site advertises colocation, business-continuity and disaster-recovery, ERP and cloud hosting; Telin's press separately confirmed this as the country's first dedicated Telkomcel data-center building. No tier certification, power or cooling detail is published. GlobalPetrolPrices does not publish a business electricity rate for Timor-Leste; the country's small, largely diesel-dependent grid means a standard commercial benchmark was not available from the sources checked.

Frequently asked questions

How much does colocation cost in Timor-Leste?

No published wholesale $/kW benchmark exists for Timor-Leste yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Where is colocation cheaper near Timor-Leste?

Timor-Leste sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Timor-Leste market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Timor-Leste?

Coloprice tracks 1 data centers in Timor-Leste: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.