1 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Timor-Leste: Q3 2026 Price Index
Compare 1 data centers in Timor-Leste across 1 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Timor-Leste & other markets — The Colocation Price Index →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Telkomcel Data Center | Telkomcel (Telkom Indonesia International) | Timor-Leste | Dili | — | — | — | data pending | Operational |
Nothing matches the filters
All 1 facilities, A–Z
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
· · ·
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Timor-Leste | · · · | — | 1 | — |
| Indonesia | · · · | $0.063 | 204 | — |
| Australia | $188 | $0.252 | 168 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Timor-Leste enters the catalog through Telkomcel, the Telkom Indonesia International (Telin) mobile and ICT brand, which operates a data center from its headquarters building on Rua Presidente Nicolau Lobato in Dili. The operator's own site advertises colocation, business-continuity and disaster-recovery, ERP and cloud hosting; Telin's press separately confirmed this as the country's first dedicated Telkomcel data-center building. No tier certification, power or cooling detail is published. GlobalPetrolPrices does not publish a business electricity rate for Timor-Leste; the country's small, largely diesel-dependent grid means a standard commercial benchmark was not available from the sources checked.
Frequently asked questions
How much does colocation cost in Timor-Leste?
No published wholesale $/kW benchmark exists for Timor-Leste yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Where is colocation cheaper near Timor-Leste?
Timor-Leste sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Timor-Leste market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Timor-Leste?
Coloprice tracks 1 data centers in Timor-Leste: 1 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →
