Data Center Colocation Costs in Uganda: Q3 2026 Price Index

Compare 1 data centers in Uganda across 1 operators, 2 MW: capacity, status, certifications, facilities and colocation pricing context.

1 facilities2 MW tracked1 operators

Colocation pricing: Uganda & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.102

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 2+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Uganda· · ·$0.1021
Kenya· · ·$0.1719

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Uganda's only catalog entry is Raxio UG1 in Kampala, opened in 2021 as the country's first Tier III-certified, carrier- and cloud-neutral colocation facility, with capacity for up to 400 racks, 1.5 MW of IT power and an Uptime Institute Tier III Certification of Design Documents. No Constructed Facility award or competing independent operator has been identified in the country yet. Business electricity runs $0.102/kWh (GlobalPetrolPrices, Dec 2025), reflecting a grid dominated by hydropower from the Nalubaale, Kiira and Karuma dams and distributed by UMEME under tariffs set by the Electricity Regulatory Authority. Uganda is a new entry in the catalog, reflecting the country's still-nascent commercial colocation market relative to regional hubs like Kenya and South Africa.

Frequently asked questions

How much does colocation cost in Uganda?

No published wholesale $/kW benchmark exists for Uganda yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 1 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Uganda?

Commercial electricity in Uganda is $0.102 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 1 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Uganda?

Uganda sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Uganda market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Uganda?

Coloprice tracks 1 data centers in Uganda: 1 operational with 2 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Raxio UG1Raxio Data Centre SMC LimitedUgandaKampala1.5III44DOperational