KT-Telecom (Kazakhtelecom) with Firebird data centers
Coloprice tracks one KT-Telecom (Kazakhtelecom) with Firebird facility: Data Center Valley (Ekibastuz) in Ekibastuz, Kazakhstan. It publishes 50 MW of IT capacity.
By status: 1 under construction. Certifications reported across these facilities include Tier III design.
Key facts
- Facilities
- 1
- Countries
- Kazakhstan
- Cities
- 1
- Published capacity
- 50 MW (1 of 1 facilities publish MW)
- Status
- 1 under construction
- Certifications
- Tier III design
- Sources
- Prime Minister of Kazakhstan — Data Center Valley: government, Firebird and NVIDIA sign $10bn AI agreement package · Prime Minister of Kazakhstan — Bektenov inspects Data Center Valley implementation in Ekibastuz (30 Jan 2026) · Kazakhstan Today — first 50 MW Data Center Valley facility to launch in June 2027
Figures are aggregated from the facility cards below. Capacity is summed only where the operator publishes MW, so totals are floors, not estimates.
Coloprice Score of KT-Telecom (Kazakhtelecom) with Firebird
- Average score
- 33 out of 100 across 1 facilities
- Best facility
- Data Center Valley (Ekibastuz) · 33E
- Class distribution
- E 1
Each facility is scored on its own from published, source-cited data; the operator figure is a plain average. How the score is calculated.
KT-Telecom (Kazakhtelecom) with Firebird facilities in the catalog
| Facility | Location | MW | Score | Status |
|---|---|---|---|---|
| Data Center Valley (Ekibastuz) | Ekibastuz, Kazakhstan | 50 | 33E | Under construction |
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
← All operators · ← All facilities
Operate these facilities? Claim the profile — free data check and badges →
Represent KT-Telecom (Kazakhtelecom) with Firebird? Claim and verify these listings — corrections ship within a week.
Claim listings