Data Center Site-Selection Checklist

Power-first site evaluation checklist: grid capacity and timeline, energy price, latency, incentives, water, hazards, connectivity.

Power (decides everything)

  • Grid connection: available MW today vs after upgrade; utility queue time in writing
  • Tariff: $/kWh now and 5-year trajectory (see electricity benchmarks)
  • Renewables: PPA/Direct PPA availability, on-site generation rights
  • Backup fuel logistics and permits for gensets

Location & risk

  • Flood plain, seismic zone, extreme heat days per year
  • Latency to target users/exchanges (ms) and subsea cable proximity
  • Airport distance, road access for equipment delivery
  • Political/regulatory: data residency laws, moratoriums (Singapore precedent, Malaysia 2026 non-AI restrictions)

Incentives & cost

  • Tax holidays (e.g. Thailand BOI: 8-year corporate income tax exemption, duty-free equipment)
  • Land: purchase vs long lease; foreign ownership rules
  • Build cost benchmark for the market ($/MW — see cost guide)

Ecosystem

  • Carriers on-site or nearby; IX access
  • Skilled workforce: electricians, mechanical, NOC talent pool
  • Vendor logistics: racks/UPS/cooling supply chain (see suppliers)