Both columns are built from the catalog and the price index: Dammam — 12 facilities from 9 operators, Riyadh — 12 facilities from 9 operators. Where a benchmark or a tariff is not published, the cell says so.

Markets side by side

FieldDammamRiyadh
Tracked facilities1212
Operators99
Published IT capacity226 MW (4 of 12 sites publish)78 MW (2 of 12 sites publish)
Operational1111
Under construction / announced11
Tier III+ certified sites41
Sites with any certification75
Liquid-cooled sites00
AI-ready sites10
Wholesale benchmark, $/kW/monthnot publishednot published
Benchmark change, yoynot publishednot published
Industrial power tariff, $/kWh$0.074$0.074
Average Coloprice Score22/100 across 12 sites18/100 across 12 sites
Latency between the twonot published

Counts are the Coloprice catalog as of 2026-10-01; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.

Where they differ

Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.

  • Published IT capacity: Dammam — 226 MW (4 of 12 sites publish); Riyadh — 78 MW (2 of 12 sites publish)
  • Tier III+ certified sites: Dammam — 4; Riyadh — 1
  • Sites with any certification: Dammam — 7; Riyadh — 5
  • AI-ready sites: Dammam — 1; Riyadh — 0
  • Average Coloprice Score: Dammam — 22/100 across 12 sites; Riyadh — 18/100 across 12 sites

Top facilities by score

Dammam, Saudi Arabia

Riyadh, Saudi Arabia

Open Dammam data centers →Open Riyadh data centers →Colocation pricing in Dammam →Colocation pricing in Riyadh →

Other comparisons

Dammam vs JeddahJeddah vs RiyadhRiyadh vs Dubai