Market comparison
Nonthaburi, Thailand vs Samut Prakan, Thailand
Both columns are built from the catalog and the price index: Nonthaburi — 3 facilities from 2 operators, Samut Prakan — 4 facilities from 3 operators. Where a benchmark or a tariff is not published, the cell says so.
Nonthaburi, Thailand
3
Tracked facilities · Operators: 2
Wholesale benchmark, $/kW/month: not published
Samut Prakan, Thailand
4
Tracked facilities · Operators: 3
Wholesale benchmark, $/kW/month: not published
Markets side by side
| Field | Nonthaburi | Samut Prakan |
|---|---|---|
| Tracked facilities | 3 | 4 |
| Operators | 2 | 3 |
| Published IT capacity | 3 MW (2 of 3 sites publish) | 48 MW (3 of 4 sites publish) |
| Operational | 3 | 3 |
| Under construction / announced | 0 | 1 |
| Tier III+ certified sites | 0 | 2 |
| Sites with any certification | 2 | 2 |
| Liquid-cooled sites | 0 | 1 |
| AI-ready sites | 0 | 2 |
| Wholesale benchmark, $/kW/month | not published | not published |
| Benchmark change, yoy | not published | not published |
| Industrial power tariff, $/kWh | $0.128 | $0.128 |
| Average Coloprice Score | 22/100 across 3 sites | 38/100 across 4 sites |
| Latency between the two | not published | |
Counts are the Coloprice catalog as of 2026-09-26; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Tracked facilities: Nonthaburi — 3; Samut Prakan — 4
- Operators: Nonthaburi — 2; Samut Prakan — 3
- Published IT capacity: Nonthaburi — 3 MW (2 of 3 sites publish); Samut Prakan — 48 MW (3 of 4 sites publish)
- Under construction / announced: Nonthaburi — 0; Samut Prakan — 1
- Tier III+ certified sites: Nonthaburi — 0; Samut Prakan — 2
- Liquid-cooled sites: Nonthaburi — 0; Samut Prakan — 1
- AI-ready sites: Nonthaburi — 0; Samut Prakan — 2
- Average Coloprice Score: Nonthaburi — 22/100 across 3 sites; Samut Prakan — 38/100 across 4 sites
Top facilities by score
Nonthaburi, Thailand
- NT Data Center Nonthaburi 1 National Telecom Public Company Limited (NT) · 1.7 MW
- NT Data Center Nonthaburi 2 National Telecom Public Company Limited (NT) · 1.7 MW
- True IDC North Muangthong True IDC
Samut Prakan, Thailand
- ETIX Bangkok 1 (BKK1) ETIX Everywhere / Interlink Telecom · 5 MW
- GSA01 Bangkok Campus (Bang Phli) GSA Data Center (Gulf, Singtel Nxera, AIS) · 20 MW
- ETIX Bangkok 2 (BKK2) ETIX Everywhere / Interlink Telecom · 23 MW
Open Nonthaburi data centers →Open Samut Prakan data centers →Colocation pricing in Nonthaburi →Colocation pricing in Samut Prakan →
Other comparisons
Bangkok vs NonthaburiChonburi vs NonthaburiBangkok vs Samut PrakanChonburi vs Samut Prakan