Operator comparison
Eurofiber vs NorthC
Both columns come from the facilities each operator publishes and Coloprice tracks: Eurofiber — 8 facilities in 1 countries, NorthC — 29 facilities in 3 countries. Score is the independent Coloprice Score of each facility, averaged; it is never sold.
Eurofiber
8
Tracked facilities · Countries: 1
Where they operate: Netherlands
NorthC
29
Tracked facilities · Countries: 3
Where they operate: Germany, Netherlands, Switzerland
Portfolios side by side
| Field | Eurofiber | NorthC |
|---|---|---|
| Tracked facilities | 8 | 29 |
| Countries | 1 | 3 |
| Cities | 8 | 21 |
| Published IT capacity | not published | 111 MW (28 of 29 sites publish) |
| Operational | 8 | 26 |
| Under construction / announced | 0 | 3 |
| Liquid-cooled sites | 0 | 2 |
| AI-ready sites | 0 | 2 |
| Most common certifications | not published | ISO 27001, ISO 9001, ISO 14001, ISO 22301 |
| Average Coloprice Score | 9/100 across 8 scored sites | 38/100 across 29 scored sites |
| Awards and badges | not published | 37 |
| Highest-scored facility | Eurofiber Datacenter NL Zuid-West 2 (9/100) | NorthC Aalsmeer (58/100) |
Counts are the Coloprice catalog as of 2026-10-01; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Tracked facilities: Eurofiber — 8; NorthC — 29
- Countries: Eurofiber — 1; NorthC — 3
- Cities: Eurofiber — 8; NorthC — 21
- Operational: Eurofiber — 8; NorthC — 26
- Under construction / announced: Eurofiber — 0; NorthC — 3
- Liquid-cooled sites: Eurofiber — 0; NorthC — 2
- AI-ready sites: Eurofiber — 0; NorthC — 2
- Average Coloprice Score: Eurofiber — 9/100 across 8 scored sites; NorthC — 38/100 across 29 scored sites
- Highest-scored facility: Eurofiber — Eurofiber Datacenter NL Zuid-West 2 (9/100); NorthC — NorthC Aalsmeer (58/100)
Published for only one side: Published IT capacity, Most common certifications, Awards and badges.
Highest-scored facility
Eurofiber
Eurofiber Datacenter NL Zuid-West 2
Steenbergen, Netherlands · 9/100
NorthC
NorthC Aalsmeer
Aalsmeer (Amsterdam area), Netherlands · 14 MW · 58/100
Open Eurofiber profile →Open NorthC profile →
Other comparisons
Digital Realty (Interxion) vs EurofiberEquinix vs EurofiberDigital Realty (Interxion) vs NorthCEquinix vs NorthCNorthC vs SwisscomGreen Datacenter vs NorthC