Colocation in Brisbane: pricing, providers and capacity
14 operators run 18 tracked data centers in Brisbane (17 operational, 40+ MW published, 0 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
How much does colocation cost in Brisbane?
14 operators run 18 tracked data centers in Brisbane; the largest by sites is DigiCo REIT (4). There is no city-level benchmark for Brisbane; the closest published wholesale figure is Sydney at $188 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
$188 /kW·mo
Sydney · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026 · country-level benchmark, no city figure published
Published average; CBRE reports rents stable year over year
Published retail prices
No operator in Brisbane publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Brisbane
Operators with tracked data centers in Brisbane, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| DigiCo REIT | 4 / 3 | 23 | DigiCo BNE1 | not published | — |
| NEXTDC | 2 / 2 | 14 | NEXTDC B2 Fortitude Valley | Uptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility, Uptime Institute Tier IV Gold Certification of Operational Sustainability | — |
| Fujitsu | 1 / 1 | 2 | Fujitsu Eight Mile Plains Data Centre | NABERS 3.5* | — |
| 5G Networks | 1 / 1 | not published | 5GN Brisbane Data Centre (BDC) | not published | — |
| Centuria DC | 1 / 1 | not published | Centuria DC T1 | not published | — |
| Christie Systems Services | 1 / 1 | not published | Christie Systems DC1 | not published | — |
| Equinix | 1 / 1 | not published | Equinix BR1 | ISO 14001, ISO 22301, ISO 27001 | — |
| Host Networks | 1 / 1 | not published | Host Networks Brisbane Data Centre | not published | — |
| Interactive | 1 / 1 | not published | Interactive Brisbane Data Centre | ISO 9001, ISO 27001, RE100 | — |
| iseek | 1 / 1 | not published | LDR2 | Uptime Institute Tier IV Certification of Design Documents | — |
| Over The Wire | 1 / 1 | not published | Over the Wire - 100 Wickham | not published | — |
| Polaris Data Centre (Springfield City Group) | 1 / 1 | not published | Polaris Data Centre | ISO 9001, ISO 14001, ISO 27001 | — |
| Telstra InfraCo | 1 / 1 | not published | Telstra (InfraCo) Woolloongabba | not published | — |
| Vocus | 1 / 1 | not published | PIPE Networks Brisbane | not published | — |
Availability in Brisbane: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Brisbane?
By tracked sites: DigiCo REIT with 4. By published IT capacity: DigiCo REIT with 23 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Brisbane, including some that do not sell space.
Is there colocation capacity available in Brisbane right now?
Coloprice tracks 18 facilities here (17 operational, 1 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Brisbane?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Sydney benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Brisbane
One brief, several operators with capacity in Brisbane, Australia, same terms. Independent — no operator pays for position.
Colocation in Brisbane? One brief, several quotes.
Request quotes →