2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Brisbane (CBD): 2 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.242
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 14+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Brisbane (CBD), Australia | · · · | $0.242 | 2 | — |
| Singapore | $403 | $0.270 | 33 | — |
| Japan | · · · | $0.201 | 68 | — |
| Indonesia | · · · | $0.063 | 28 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Brisbane (CBD), Australia?
No published wholesale $/kW benchmark exists for Brisbane (CBD), Australia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Brisbane (CBD), Australia?
Commercial electricity in Brisbane (CBD), Australia is $0.242 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Brisbane (CBD), Australia?
On power alone, Japan ($0.201/kWh), Indonesia ($0.063/kWh) run below Brisbane (CBD), Australia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Brisbane (CBD), Australia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| NEXTDC B1 Brisbane CBD | NEXTDC | 2.25 | — | Operational |
| NEXTDC B2 Fortitude Valley | NEXTDC | 12 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.