▮▮Coloprice

18 facilities · 17 operators

Colocation in Costa Rica: pricing, providers and markets

17 operators run 18 tracked data centers in Costa Rica across 1 cities with at least three sites (18 operational, 0+ MW published, 0 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.

How much does colocation cost in Costa Rica?

17 operators run 18 tracked data centers in Costa Rica; the largest by sites is Navégalo S.A. (2). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Costa Rica publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Costa Rica

Operators with tracked data centers in Costa Rica, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
Navégalo S.A.2 / 2not publishedNavégalo DC-CR2ANSI/TIA-942-C Facility - Rated 3, Uptime Institute Tier III Certification of Design Documents, EPI DCOS:2021 Maturity Level 3—
ADN Datacenters (IFX Networks)1 / 1not publishedADN DatacentersUptime Institute Tier III Certification of Design Documents—
Banco Nacional de Costa Rica1 / 1not publishedBanco Nacional de Costa Rica Centro de Procesamiento de Datos del CFBNCRUptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility Tier III Gold Certification of Operational Sustainability—
Banco Popular y de Desarrollo Comunal1 / 1not publishedCentro de Procesamiento de Datos Principal de Banco PopularUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Gold Certification of Operational Sustainability—
Codisa Data Center (Ideas Gloris S.A.)1 / 1not publishedCODISA Data Center – Edificio 2 – Suite A / Suite D / Suite IANSI/TIA-942-C Rated 3 (Constructed Facility)—
Critical Colocation, S.A.1 / 1not publishedSede CR-SJO Data CenterUptime Institute Tier III Certification of Design Documents, Uptime Institute M&O Stamp of Approval—
CRIX1 / 1not publishedCRIXnot published—
Cyberfuel S.A.1 / 1not publishedCyberfuel Data CenterANSI/TIA-942-C Facility - Rated 3, EPI DCOS:2021 Maturity Level 3—
GBM de Costa Rica, S.A.1 / 1not publishedGBM de Costa Rica Data CenterEPI DCOS:2021 Maturity Level 5—
Green Data Services S.A.1 / 1not publishedGDS DatacenterUptime Institute Tier III Certification of Design Documents—
Ideas Gloris1 / 1not publishedIdeas Gloris CODISA Data Center - IIUptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Gold Certification of Operational Sustainability—
IFX Networks (brand IFX-CODISA)1 / 1not publishedCODISA Data Center IIUptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Gold Certification of Operational Sustainability—
IFX Networks (Ideas Gloris S.A.)1 / 1not publishedNAP de CentroaméricaUptime Institute Tier III Certification of Design Documents—
Liberty Costa Rica1 / 1not publishedData Center TiribíUptime Institute Tier III Certification of Design Documents—
Rack Lodge Data Center1 / 1not publishedRack Lodge Data Centernot published—
RECOPE1 / 1not publishedCentro de Datos RECOPE, El AltoUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Silver Certification of Operational Sustainability—
Universidad Nacional (UNA)1 / 1not publishedCPD de la Universidad Nacional, Phase 1Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Bronze Certification of Operational Sustainability—

Colocation markets in Costa Rica

CitySites / livePublished MW
Colocation in San José12not published

Availability in Costa Rica: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Costa Rica?

By tracked sites: Navégalo S.A. with 2. By published IT capacity: with 0 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Costa Rica, including some that do not sell space.

Is there colocation capacity available in Costa Rica right now?

Coloprice tracks 18 facilities here (18 operational, 0 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Costa Rica?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Costa Rica

One brief, several operators with capacity in Costa Rica, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.