Colocation in Costa Rica: pricing, providers and markets
17 operators run 18 tracked data centers in Costa Rica across 1 cities with at least three sites (18 operational, 0+ MW published, 0 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.
How much does colocation cost in Costa Rica?
17 operators run 18 tracked data centers in Costa Rica; the largest by sites is Navégalo S.A. (2). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Costa Rica publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Costa Rica
Operators with tracked data centers in Costa Rica, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Navégalo S.A. | 2 / 2 | not published | Navégalo DC-CR2 | ANSI/TIA-942-C Facility - Rated 3, Uptime Institute Tier III Certification of Design Documents, EPI DCOS:2021 Maturity Level 3 | — |
| ADN Datacenters (IFX Networks) | 1 / 1 | not published | ADN Datacenters | Uptime Institute Tier III Certification of Design Documents | — |
| Banco Nacional de Costa Rica | 1 / 1 | not published | Banco Nacional de Costa Rica Centro de Procesamiento de Datos del CFBNCR | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility Tier III Gold Certification of Operational Sustainability | — |
| Banco Popular y de Desarrollo Comunal | 1 / 1 | not published | Centro de Procesamiento de Datos Principal de Banco Popular | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Gold Certification of Operational Sustainability | — |
| Codisa Data Center (Ideas Gloris S.A.) | 1 / 1 | not published | CODISA Data Center – Edificio 2 – Suite A / Suite D / Suite I | ANSI/TIA-942-C Rated 3 (Constructed Facility) | — |
| Critical Colocation, S.A. | 1 / 1 | not published | Sede CR-SJO Data Center | Uptime Institute Tier III Certification of Design Documents, Uptime Institute M&O Stamp of Approval | — |
| CRIX | 1 / 1 | not published | CRIX | not published | — |
| Cyberfuel S.A. | 1 / 1 | not published | Cyberfuel Data Center | ANSI/TIA-942-C Facility - Rated 3, EPI DCOS:2021 Maturity Level 3 | — |
| GBM de Costa Rica, S.A. | 1 / 1 | not published | GBM de Costa Rica Data Center | EPI DCOS:2021 Maturity Level 5 | — |
| Green Data Services S.A. | 1 / 1 | not published | GDS Datacenter | Uptime Institute Tier III Certification of Design Documents | — |
| Ideas Gloris | 1 / 1 | not published | Ideas Gloris CODISA Data Center - II | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Gold Certification of Operational Sustainability | — |
| IFX Networks (brand IFX-CODISA) | 1 / 1 | not published | CODISA Data Center II | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Gold Certification of Operational Sustainability | — |
| IFX Networks (Ideas Gloris S.A.) | 1 / 1 | not published | NAP de Centroamérica | Uptime Institute Tier III Certification of Design Documents | — |
| Liberty Costa Rica | 1 / 1 | not published | Data Center Tiribí | Uptime Institute Tier III Certification of Design Documents | — |
| Rack Lodge Data Center | 1 / 1 | not published | Rack Lodge Data Center | not published | — |
| RECOPE | 1 / 1 | not published | Centro de Datos RECOPE, El Alto | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Silver Certification of Operational Sustainability | — |
| Universidad Nacional (UNA) | 1 / 1 | not published | CPD de la Universidad Nacional, Phase 1 | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Bronze Certification of Operational Sustainability | — |
Colocation markets in Costa Rica
| City | Sites / live | Published MW |
|---|---|---|
| Colocation in San José | 12 | not published |
Availability in Costa Rica: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Costa Rica?
By tracked sites: Navégalo S.A. with 2. By published IT capacity: with 0 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Costa Rica, including some that do not sell space.
Is there colocation capacity available in Costa Rica right now?
Coloprice tracks 18 facilities here (18 operational, 0 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Costa Rica?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Costa Rica