18 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Costa Rica: Q3 2026 Price Index
Compare 18 data centers in Costa Rica across 16 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Costa Rica & other markets — The Colocation Price Index → · Best data centers in Costa Rica → · Data center companies in Costa Rica · Colocation pricing and providers in Costa Rica →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| CODISA Data Center II | IFX Networks | Costa Rica | San José | — | III | SS 564-1:2013 | data pending | Operational |
| Banco Nacional de Costa Rica Centro de Procesamiento de Datos del CFBNCR | Banco Nacional de Costa Rica | Costa Rica | Santo Domingo | — | III | — | data pending | Operational |
| Centro de Procesamiento de Datos Principal de Banco Popular | Banco Popular y de Desarrollo Comunal | Costa Rica | San José | — | III | — | data pending | Operational |
| Ideas Gloris CODISA Data Center - II | Ideas Gloris | Costa Rica | San José | — | III | — | data pending | Operational |
| Centro de Datos RECOPE, El Alto | RECOPE | Costa Rica | Cartago | — | III | — | data pending | Operational |
| CPD de la Universidad Nacional, Phase 1 | Universidad Nacional (UNA) | Costa Rica | Heredia | — | III | — | data pending | Operational |
| CODISA Data Center – Edificio 2 – Suite A / Suite D / Suite I | Codisa Data Center (Ideas Gloris S.A.) | Costa Rica | San José | — | 3 | — | data pending | Operational |
| Data Center Tiribí | Liberty Costa Rica | Costa Rica | San José | — | III | — | data pending | Operational |
| ADN Datacenters | ADN Datacenters (IFX Networks) | Costa Rica | Alajuela | — | III | — | data pending | Operational |
| Navégalo DC-CR2 | Navégalo | Costa Rica | San José | — | III | EPI DCOS:202… | data pending | Operational |
| Sede CR-SJO Data Center | Critical Colocation, S.A. | Costa Rica | San José | — | III | — | data pending | Operational |
| GDS Datacenter | Green Data Services S.A. | Costa Rica | Tilarán | — | III | — | data pending | Operational |
| NAP de Centroamérica | IFX Networks | Costa Rica | San José | — | III | — | data pending | Operational |
| Cyberfuel Data Center | Cyberfuel S.A. | Costa Rica | Santa Ana | — | — | EPI DCOS:202… | data pending | Operational |
| GBM de Costa Rica Data Center | GBM de Costa Rica, S.A. | Costa Rica | San José | — | — | EPI DCOS:202… | data pending | Operational |
| Navégalo DC-CR1 | Navégalo | Costa Rica | San José | — | — | — | data pending | Operational |
| Rack Lodge Data Center | Rack Lodge Data Center | Costa Rica | San José | — | — | — | data pending | Operational |
| CRIX | CRIX | Costa Rica | San José | — | — | — | data pending | Operational |
Nothing matches the filters
All 18 facilities, A–Z
- ADN Datacenters Alajuela
- Banco Nacional de Costa Rica Centro de Procesamiento de Datos del CFBNCR Santo Domingo
- Centro de Datos RECOPE, El Alto Cartago
- Centro de Procesamiento de Datos Principal de Banco Popular San José
- CODISA Data Center – Edificio 2 – Suite A / Suite D / Suite I San José
- CODISA Data Center II San José
- CPD de la Universidad Nacional, Phase 1 Heredia
- CRIX San José
- Cyberfuel Data Center Santa Ana
- Data Center Tiribí San José
- GBM de Costa Rica Data Center San José
- GDS Datacenter Tilarán
- Ideas Gloris CODISA Data Center - II San José
- NAP de Centroamérica San José
- Navégalo DC-CR1 San José
- Navégalo DC-CR2 San José
- Rack Lodge Data Center San José
- Sede CR-SJO Data Center San José
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.255
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 13 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Costa Rica | · · · | $0.255 | 18 | — |
| Panama | · · · | $0.222 | 14 | — |
| Guatemala | · · · | $0.198 | 10 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Costa Rica's catalog has expanded to seven disclosed sites, still centered on San José. IFX Networks holds the country's most complete Uptime record at CODISA Data Center II (Tier III Design, Constructed Facility and Gold Operational Sustainability) and adds a second San José building, NAP de Centroamérica (Tier III Design), plus the Tier III-design ADN Datacenters site in nearby Alajuela. Independent operator Navégalo runs DC-CR2 as part of a wider Central American network, joined now by Critical Colocation's CR-SJO site, Liberty Costa Rica's Tiribí facility (primarily internal but open to enterprise clients), and Green Data Services' GDS Datacenter in Tilarán, Guanacaste — the only certified site disclosed outside the San José/Alajuela metro area. None of the seven discloses IT power capacity or floor area. Business electricity runs $0.255/kWh (GlobalPetrolPrices, Dec 2025), the highest recorded in Central America here, trading off against a grid close to 100% renewable via state utility ICE.
Frequently asked questions
How much does colocation cost in Costa Rica?
No published wholesale $/kW benchmark exists for Costa Rica yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 18 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Costa Rica?
Commercial electricity in Costa Rica is $0.255 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 18 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Costa Rica?
On power alone, Panama ($0.222/kWh), Guatemala ($0.198/kWh) run below Costa Rica. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Costa Rica market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Costa Rica?
Coloprice tracks 18 data centers in Costa Rica: 18 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →
